2021 ANNUAL REPORT

1.0 HADEJIA JAMA’ARE RIVER BASIN DEVELOPMENT AUTHORITY

 

2021 ANNUAL REPORT

Introduction

 

The Hadejia Jama’are River Basin Development Authority was created in 1976 along with ten other River Basin Development Authorities by the Federal Government of Nigeria under Decree 25 of same year.  Presently the Authority has the largest functional irrigation schemes among the twelve River Basin Development Authorities in the country covering 21,800 hectares. The Authority covers an area of 45,000km2 (whole of Kano and Jigawa States, and about two-thirds of Bauchi State) with an irrigation development potential of about 212,000 hectares within the Vallies of Hadejia and Jama’are Rivers.  The Administrative Headquarters of the Authority is located at Hotoro, Maiduguri Road, in Tarauni Local Government Area of Kano Municipality.

 

  • Mission and Vision

 

In line with its statutory functions, the mission and vision of the Authority have been defined as thus:

 

1.1.1 Corporate Mission

Effective management of Water Resources for the development of socio-economic activities of the people within the basin through access to water for irrigation, domestic and other uses in a sustainable manner.

 

The ultimate aim is to efficiently utilize the available water resources with a view to improving the socio-economic status and quality of life, particularly, of the people living within the Authority’s catchments area through supply of water for irrigation, human and livestock consumption, fisheries development and industrial uses.

 

1.1.2 Vision

To be the River Basin Development Authority with the largest functioning infrastructures for agriculture, irrigation and water supply that meets the socio-economic needs of its clientele.

 

1.2 General Introduction of the Authority

 

  • The Hadejia Jama’are River Basin Development Authority was created in 1976 along with ten other River Basin Development Authorities by the Federal Government of Nigeria under Decree No. 25.of 1976
  • The Administrative Headquarters of the Authority is located at Hotoro, Maiduguri Road, in Tarauni Local Government Area of Kano Municipality.
  • The Authority covers an area of 45,000km2(whole of Kano and Jigawa States, and about two-thirds of Bauchi State) with an irrigation development potential of about 212,000 hectares within the Vallies of Hadejia and Jama’are Rivers.
  • Presently the Authority has the largest functional irrigation schemes (21,000 ha) among the twelve River Basin Development Authorities in the country.

1.3 Structure and Functions of the Authority

 

  • The Authority is responsible for the development of surface and underground water resources for irrigated agriculture, water supply and other uses within its catchment areas in Kano, Jigawa and Bauchi States.
  • The statutory functions of the Authority as contained in its enabling law as amended over time are as follows:
  1. To undertake a comprehensive development of underground and surface water resources for multipurpose use with emphasis on provision of irrigation water.
  2. To undertake schemes for erosion and flood control and for watershed management including afforestation and orchard development.
  3. To construct, and maintain dams, dykes polders, wells, boreholes; and irrigation and drainage systems.
  4. To provide water from reservoirs and lakes for irrigation purpose to farmers as well as urban and rural water supply.
  5. To operate water legislation and control measures and development; and update water resources master plan of the area of Authority’s development and management, and
  6. To undertake jobs on contract basis for Federal, States and Local Governments and private clients.

 

1.4 Photograph of the Chief Executive/Managing Director of the Authority as at Dec, 2021 

 

 

 

 

 

 

 

 

 

 

 

Ma’amun Da’u Aliyu

Managing Director (HJRBDA), Kano.

 

2.0 Core Projects Executed by the Authority in 2021 excluding boreholes

 

SN  Project Title  Location of the Project (Village or Community, LGA and State)  2021 Appropriation (N) Total Cost of the Project/Contractual Sum (N) Amount Released to Date  (N) Amount Utilized (n) Outstanding Balance (N) Year of Commencement of the Project Expected completion Period % of Present Status  Name of Contractor  Name of Consultant that is supervising the Project Date of Award State Volumes of Water Impounded (if it is dam Project) State the Potential Area to be developed as well as the actual area already developed if it is Irrigation Project Total

No. of Benefitting Farmers

Constraints/Remarks
1 Flood And Erosion Control At Sabon Gari, Jigawa State Jigawa State 14,250,000 29,331,697:50          4,275,000.00 0.00          4,275,000.00 12th October, 2021 2022 100 Mai Ulu Nigeria Limited   12th October, 2021       Untimely and inadequate releases of funds
2 Sauna – Kawaji Erosion Control And River Bank Reclamation Works (Left Bank), Nassarawa Lga, Kano State Nassarawa Lga, Kano State 4,750,000 4,750,000          1,900,000.00 0.00          1,900,000.00 12th October, 2021 2021 100 Kago Nig. Ltd   12th October, 2021       Study and Design
3 Katagum Flood Control And Land Reclamation Project, Bauchi State Zaki Lga, Bauchi State 14,611,000 231,250,356.83        10,233,918.32 8,766,600.00          1,467,318.32 2019 2022 100 A. U Iya Global Ventures Ltd   2019       Untimely and inadequate releases of funds
4 Kaidaji-Alkamawa Flood Protection And Land Reclamation Project, Kano State   29,127,000 213,985,202.09        13,736,100.00 13,736,100.00                          – 2018 2022 100 Guji Global Links Ltd   2018       Untimely and inadequate releases of funds
5 Construction Of Kanta – Imawa Rural Access Road, Drainage And Erosion Control Kano State 19,000,000 249,071,329:50          5,700,000.00 0.00          5,700,000.00 12th October, 2021 2022 100 Kye Builders & Investment Ltd   12th October, 2021       Untimely and inadequate releases of funds
6 Ajingi/Rinjin Fulani Kura Storm Water And Flood Control Project Ajingi Lga, Kano State 63,892,250 248,920,299.24        61,140,079.98 51,440,079.98          9,700,000.00 2017 2021 100% Kye Builders & Investment Ltd   2017       Untimely and inadequate releases of funds
Consultancy Works     9,700,000.00   9,700,000.00        (9,700,000.00)         Think Engineering Ltd        
7 Maigatari Flood Control And Land Reclamation Project, Jigawa State Maigatari Lga, Kano State 26,227,125 234,186,435.00        15,736,275.00 15,736,275.00                          – 2018 2022 45% M-Sulum Nig. Ltd   2018       Untimely and inadequate releases of funds
8 University Of Dutse Flood And Erosion Control Project Dutse Lga, Jigawa State 38,057,000 208,618,991.99        20,000,000.00 20,000,000.00                          – 2017 2021 100% A. Y. H Investments Company Ltd   2017       Untimely and inadequate releases of funds
9 Maratayi/Kofar Gabas, Zangon Tagwai, Kawaji And Sauna Flood And Erosion Control, Kano State Nassarawa Lga, Kano State 4,750,000 0.00          2,375,000.00 0.00          2,375,000.00 12th October, 2021 2021   New   12th October, 2021       Study and Design
10 Rafin Arewa (Misau) Flood Erosion Control Misau Lga, Bauchi State 14,250,000 29,058,850:41          4,275,000.00 0.00          4,275,000.00 12th October, 2021 2022   Over-One Consult And Investment Ltd   12th October, 2021       Untimely and inadequate releases of funds
11 Rehabilitation Of Hjrbda Headquarters And Irrigation Schemes Management Offices In Kano, Jigawa And Bauchi States Kano, Jigawa And Bauchi States 59,280,000 85,603,519.05        39,125,274.26 38,826,216.81             299,057.45 2017 2022 55% Ayh Investment Co. Ltd   2017       Untimely and inadequate releases of funds
16 Upgrading And Expansion Of Challawa Spring Water Processing And Bottling Plant Karaye Lga, Kano State 11,457,000 91,114,772.96          4,019,925.00 3,437,100.00             582,825.00 2017 2021 70% Manajee Engr. Ltd   2017       Untimely and inadequate releases of funds
25 Partnership For Expanded Water Sanitation And Hygience (Pewash) Kano, Jigawa And Bauchi States 9,500,000 9,500,000:00          2,850,000.00 0.00          2,850,000.00 12th October, 2021 2022   Marshall Engineering   12th October, 2021       Untimely and inadequate releases of funds
26 Rehabilitation And Construction Of Thomas Dam Dambatta And Other Selected Dams Within The Within The Zone (Section I) Danbatta Lga, Kano State 200,000,000 73,156,437.50      140,000,000.00 0.00      140,000,000.00 12th October, 2021 2022   Sinti Nigeria Ltd   12th October, 2021 under rehabilitation     Untimely and inadequate releases of funds
Consultancy Works 9,780,000.00   9,780,000.00        (9,780,000.00)         Kul-Dwell Consultants        
27 Rehabilitation and Construction of Thomas Dam Dambatta And Other Selected Dams Within The Within The Zone (Section Ii) Danbatta Lga, Kano State 200,000,000 248,444,609:66      140,000,000.00 0.00      140,000,000.00 12th October, 2021 2022   Sinti Nigeria Limited   12th October, 2021 under rehabilitation     Untimely and inadequate releases of funds
Consultancy Works 9,720,000.00 9,720,000.00        (9,720,000.00)         Kul-Dwell Consultants        
28 Establishment Of Improved Seed Multiplication And Processing Centre Kura Lga, Kano State 10,884,150 239,387,504.41          6,530,490.00 6,530,490.00                          – 2018 2022 40% Princess Glam Kn Ltd   2018       Untimely and inadequate releases of funds
29 Establishment Of Model Farm Centre Based On Songhai Model Wudil Lga, Kano State 61,605,600 61,214,532.42        30,802,800.00 0.00        30,802,800.00 12th October, 2021 2022   Asasco Nigeria Ltd   12th October, 2021       Untimely and inadequate releases of funds
30 Study And Design Of Small Earth Dams In Kano, Jigawa And Bauchi States Kano, Jigawa And Bauchi States 14,307,000 14,307,000.00        14,307,000.00 14,307,000.00                          – 2017 2022 60%   EMI ENGR. NIG. LTD 2017       Untimely and inadequate releases of funds
31 Completion Of Data Bank And Management Information Systems Kano State 9,690,000 3,000,000.00          7,107,000.00 7,107,000.00                          – 2017 2021 60% Boolean Computers Nig Ltd   2017       Untimely and inadequate releases of funds
32 Establishment And Equipping Of Engineering Design Office Kano State 6,042,000 17,768,123.25          4,000,000.00 4,000,000.00                          – 2018 2022 45% Ql Teknik Ltd   2018       Untimely and inadequate releases of funds
33 Establishment Of Small Scale Irrigation Schemes In Kano, Jigawa And Bauchi States Kano, Jigawa And Bauchi States 24,161,350 56,802,784.50          9,421,412.80 9,421,412.80                          – 2017 2022 60% Slars Nig. Ltd   2017   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
34 Completion Of Galala Irrigation Project Ningi Lga, Bauchi State 27,930,000 26,533,008:55          8,379,000.00 0.00          8,379,000.00 12th October, 2021 2022   ABJ & H Construction Limited   12th October, 2021   620 ha.              4,960 Untimely and inadequate releases of funds
35 Construction Of Kyarama Irrigation Scheme Jigawa State Ringim Lga, Jigawa State 29,286,600 209,333,797.31        17,571,960.00 17,571,960.00                          – 2018 2022 45% Hdf & Sons Nig. Ltd   2018   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
36 Construction Of Kanti – Gada, Kuda And Kwaita Small Irrigation Scheme Jigawa State Kazaure Lga, Jigawa State 19,123,500 126,144,411.75        19,123,500.00 19,123,500.00                          – 2018 2022 70% Mustapha Yakasai Constr. Co. Ltd   2018   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
37 Establishment Of Centre Pivot Sprinkler Irrigation Scheme In Hadejia, Jigawa State Hadejia Lga, Jigawa State 22,800,000 193,942,505.59          8,840,000.00 2,000,000.00          6,840,000.00 2019 2022 30% Abbysia Investment Ltd   2019   The project is ongoing The project is ongoing Untimely and inadequate releases of funds
38 Establishment Of Centre Pivot Sprinkler Irrigation Scheme In Jama’are, Bauchi State Jama’are Lga, Bauchi State 16,872,000 199,600,851.24          8,436,000.00 8,436,000.00                          – 2019 2022 30% Isa Halilu Nig. Ltd   2019   The project is ongoing The project is ongoing Untimely and inadequate releases of funds
39 Establishment Of Drip Irrigation Schemes In Kano, Jigawa And Bauchi States Kano, Jigawa And Bauchi States 13,594,500 109,408,699.53        13,594,500.00 13,594,500.00                          – 2019 2022 30% Dills Grantal Nig. Ltd   2019   The project is ongoing The project is ongoing Untimely and inadequate releases of funds
40 Completion Of Kiri-Kasamma, Guri And Birniwa Small Irrigation Schemes  Kiri-Kasamma, Guri And Birniwa Lgas,Jigawa State 3,234,750            2,264,325.00            2,264,325.00 12th October, 2021 2022   New   12th October, 2021   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
41 Construction Of Kafin Zaki Small Irrigation Scheme Ganjuwa Lga, Bauchi State 9,590,250 10,134,862.50          5,754,150.00 5,754,150.00                          – 2018 2021 100% Ramadan Construction Nig. Ltd   2018   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
42 Construction Of Udubo – Wabu Irrigation Scheme Gamawa Lga, Bauchi State 17,100,000 54,046,424.25        17,100,000.00 17,100,000.00                          – 2018 2021 100% Altima Inergrated Services Ltd   2018   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
43 Operation And Maintenance Of Hadejia Valley Irigation Project Infrastructures Hadejia Lga, Jigawa State 39,415,500 248,676,225.00        39,415,500.00 39,415,500.00                          – 2017 2022 65% M. Sulum Nigeria Ltd   2017   25,000 ha/5,300 ha.            42,400 Untimely and inadequate releases of funds
44 Operation And Maintenance Of Kano River Irrigation Project Infrastructures Kura, Garun Malam Lgas Kano State 42,750,000 231,471,865.01        42,750,000.00 42,750,000.00                          – 2017 2022 65% Pal Overseas Res. Ltd   2017   22,000 ha /16,500 ha.          132,000 Untimely and inadequate releases of funds
45 Completion Of Challawa Karaye Irrigation Scheme Karaye Lga, Kano State 30,352,500 27,731,182.50        19,329,286.88 19,329,286.88                          – 2018 2022 55% Akoon Multi Services Ltd   2018   200 ha.              1,600 Untimely and inadequate releases of funds
46 Establishment Of Centre Pivot Sprinkler Irrigation Scheme In Tudun Wada Lga, Kano State Tudun Wada Lga, Kano State 23,142,000 248,081,402.98          6,942,600.00 3,000,000.00          3,942,600.00 2019 2022 30% Potenzia Seed Ltd   2019   The project is ongoing The project is ongoing Untimely and inadequate releases of funds
47 Construction Of Shangu Small Earth Dam And Irrigation Scheme In Kano State Rano Lga, Kano State 14,298,030 238,525,693.55          7,345,739.06 7,345,739.06                          – 2018 2022 70% S. Tabawa Nigeria Ltd   2018 150.mcm     Untimely and inadequate releases of funds
48 Completion Of Tsanyawa-Wanzamai Small Earth Dam Tsanyawa Lga, Kano State 14,250,000 15,000,000.00          9,975,000.00 8,550,000.00          1,425,000.00 2019 2022 45% Au Iya Global Ventures Ltd   2019 225mcm     Untimely and inadequate releases of funds
49 Rehabilitation Of Hadejia Pump Based Irrigation Scheme Hadejia Lga, Jigawa State 16,530,000 130,234,107.44        11,571,000.00 11,571,000.00                          – 2018 2021 100%  Yayari Ventures Nig. Ltd   2018   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
50 Operation And Maintenance Of Tiga Dam Bebeji Lga, Kano State 46,311,360 141,198,475.00        46,311,360.00 46,311,360.00                          – 2017 2022 65% Abdurrahman Abdulhamid Ventures Ltd   2017 1,974mil.m3     Untimely and inadequate releases of funds
51 Rehabilitation And Remodelling Of Wudil Pilot Irrigation Scheme For Commercial Operations, Kano State Wudil Lga, Kano State 14,307,000 97,753,386.98          8,584,200.00 8,584,200.00                          – 2017 2022 48%  Sanrouk Engr. Services Ltd   2017   The project is ongoing The project is ongoing Untimely and inadequate releases of funds
52 Completion Of Katagum Irrigation Project Zaki Lga, Bauchi State 17,157,000 182,698,692.75        10,269,378.69 10,269,378.69                          – 2017 2022 48%  Ramadan Construction Nig. Ltd   2017   200 ha.              1,600 Untimely and inadequate releases of funds
53 Completion Of Sawe Pilot Irrigation Scheme Gwaram Lga 28,500,000 91,261,130:63          8,550,000.00 0.00          8,550,000.00 12th October, 2021 2022   Mustapha Yakasai Const Co Ltd   12th October, 2021   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
54 Construction Of Gamawa Irrigation Scheme Gamawa Lga, Bauchi State 19,000,000 18,900,112:50          5,700,000.00 0.00          5,700,000.00 12th October, 2021 2022   Mimo Industries Limited   12th October, 2021   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
55 Completion Of Sata Small Earth Dam Bebeji Lga, Kano State 9,880,000 78,127,366.01          3,952,000.00 2,964,000.00             988,000.00 2017 2021 100%  Sat Engineering Services Ltd   2017 under design     Untimely and inadequate releases of funds
56 Rehabilitation And Expansion Of Commercial Orchads In Kadawa, Challawa, Hadejia And Zigau In Kano, Jigawa And Bauchi States Kano, Jigawa And Bauchi States 11,770,500 98,931,536.48          3,531,150.00 3,531,150.00                          – 2018 2022 45%  U.Y.K. Nigeria Ltd   2018       Untimely and inadequate releases of funds
57 Operation And Maintenance Of Hadejia Barrage Hadejia Lga, Jigawa State 33,307,000 143,367,000.00        29,236,534.99 29,236,534.99                          – 2017 2022 65% Century Trades Ltd   2017 11.4mcm     Untimely and inadequate releases of funds
58 Construction Of Earth Dam And Irrigation Scheme At Misau, Bauchi State – On-Going Misau Lga, Bauchi State 28,596,416 149,805,649.35        11,578,924.65 11,578,924.65                          – 2018 2022 30%  Kago Nigeria Ltd   2018   50ha. 400 Untimely and inadequate releases of funds
59 Rehabilitation Of Warwade Dam And Irrigation Scheme, Jigawa State Dutse Lga, Jigawa State 20,064,000 98,452,895.44          8,025,600.00 6,019,200.00          2,006,400.00 2018 2021 100%  Civhydro Engineering Nig. Ltd   2018   500 ha.         4,000.00 Untimely and inadequate releases of funds
60 Completion Of Tafga Earth Dam And Water Supply Scheme Doguwa Lga, Kano State 25,080,000 299,156,265.97        25,080,000.00 21,134,000.00          3,946,000.00 2017 2022 63%  Rhozeta Nig. Ltd   2017 153 mcm     Untimely and inadequate releases of funds
9,865,000.00   3,946,000.00        (3,946,000.00)        Baba Consult          
61 Operation And Maintenance Of Challawa Gorge Dam Karaye Lga, Kano State 31,641,650 131,714,407.00        31,641,650.00 31,641,650.00                          – 2017 2022 65% Nagari Geologist & Services Ltd   2017 930.0mcm     Untimely and inadequate releases of funds
62 Construction Of Earth Dam And Irrigation Scheme At Maigatari, Jigawa State – On-Going Maigatari Lga, Kano State 77,520,000 187,408,488.75        43,179,484.30 43,179,484.30                          – 2018 2022 45%  M. Sulum Nigeria Ltd   2018 150 ha.     Untimely and inadequate releases of funds
63 Construction Of Dawan Biri Irrigation Scheme Gagarawa Lga, Jigawa State 19,000,000 14,250,000.00        14,250,000.00 14,250,000.00                          – 2021 2022   Samaplus Engr. Constr. Ltd   2021   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
64 Large Dams (Tiga At Tuku, Challawa At Zarewa, Galala At Tudun Wada And Hadejia Barrage At Ganauchime) Water Shed Management And Catchment Access Roads Rehabilitation In Kano, Jigawa And Bauchi States. Kano, Jigawa And Bauchi States 32,299,050 224,189,317.80        24,689,715.00 24,689,715.00                          – 2018 2022 45%  S.K & Sons Engineering Services Ltd   2018       Untimely and inadequate releases of funds
65 Rehabilitation Of Hjrbda Revenue Generating Assets In Kano, Jigawa And Bauchi States Kano, Jigawa And Bauchi States 39,957,000 127,751,669.33        11,987,100.00          11,987,100.00 2018 2022 65%  Tripple K Investment Ltd   2018       Untimely and inadequate releases of funds
66 Typha Grass Control And Management Jigawa State 14,250,000 14,237,676:25          4,987,500.00 0.00          4,987,500.00 12th October, 2021 2022   Altima Integrated Services Ltd   12th October, 2021       Untimely and inadequate releases of funds
67 Completion Of Bichi Dam Bichi Lga, Kano State 21,090,000 `        12,652,000.00 12,652,000.00                          – 2018 2021 85%  Kago Nigeria Limited   2018 under construction     Untimely and inadequate releases of funds
68 Construction Of Kungu And Malikawar Garu Small Earth Dams Tsanyawa Lga, Kano State 8,464,500 8,910,000.00          5,464,500.00 5,464,500.00                          – 2018 2022 45%  Dills Grantal Nig. Ltd   2018 under construction     Untimely and inadequate releases of funds
69 Construction Of Koreyel Earth Dam, Jigawa State Gwiwa Lga, Jigawa State 22,734,208 199,145,886.98        18,083,436.21 18,083,436.21                          – 2019 2022 30%  Alpha – Zeta Global Tech. Services Ltd   2019 under construction     Untimely and inadequate releases of funds
70 Annual Budget Implementation Monitoring And Evaluation Kano State 15,390,000 0.00          8,464,500.00 5,229,500.00          3,235,000.00       Bello Baba Yola (Cso)           Budget Cycle, Routine Activities
      2,965,500.00        (2,965,500.00)       Engr. Abdussalam Ibrahim Abubakar           Untimely and inadequate releases of funds
71 Construction Of Gulka/Darazo Earth Dam, Bauchi State Darazo Lga, Jigawa State 22,952,000 130,086,950.00        18,361,600.00 18,361,600.00                          – 2018 2022 30%  Haitrix Innovation Services Ltd   2018  under construction     Untimely and inadequate releases of funds
72 Completion Of Dagwalo Dam, Birnin Kudu Lga, Jigawa State Birnin Kudu Lga, Jigawa State 24,377,000 0.00          7,313,100.00 0.00          7,313,100.00 12th October, 2021 2022       12th October, 2021  under construction     Untimely and inadequate releases of funds
73 Operation And Maintenance Of Galala Earth Dam Ningi Lga, Bauchi State 28,842,000 195,195,309.75        14,421,000.00 8,379,000.00          6,042,000.00 2017 2022 Routine Maintenance  Sat Engineering Services Ltd   2017 23 mil. m3     Untimely and inadequate releases of funds
Consultancy Works 8,547,690.00   2,308,380.00        (2,308,380.00)         Pullad Global Consultants Ltd        
74 Hadejia Jama’are-Komadugu-Yobe River System Improvement Project Jigawa State 31,834,500 208,242,294.75        22,284,150.00 22,284,150.00                          – 2018 2022 40% Hawlad Engineering Ltd   2018       Untimely and inadequate releases of funds
75 Integrated River Basin Development Management Kano State 14,250,000            4,275,000.00            4,275,000.00 2017 2022 40%     2017       Untimely and inadequate releases of funds
76 Study And Design Of Small Irrigation Schemes In Kano, Jigawa And Bauchi States Kano, Jigawa And Bauchi States 14,307,000 14,307,000.00          7,153,500.00 4,292,100.00          2,861,400.00 2017 2021 80%    HHAM CONSULTANTS LTD 2017       Untimely and inadequate releases of funds
77 River Training/Channelization Jigawa State 14,250,000 41, 203,890:00          4,275,000.00 0.00          4,275,000.00 12th October, 2021 2022   Musma Global Investment Ltd   12th October, 2021       Untimely and inadequate releases of funds
78 Large Dam Watershed Management And Catchment Access Roads Rehabilitation In Kano, Jigawa And Bauchi States Kano, Jigawa And Bauchi States 51,422,550 236,371,200.79        20,569,020.00 15,426,765.00          5,142,255.00 2017 2022 40%  Sat Engineering Services Ltd   2017       Untimely and inadequate releases of funds
79 Procurement Of Land Preparation And Post Harvest Equipment To Support Agricultural Intensification Within Hjrbda Irrigation Schemes Kano, Jigawa And Bauchi States 24,852,000 96,190,500.00          9,408,295.25 9,408,295.25                          – 2017 2022 45%  Saint Engineering Services Ltd   2017       Untimely and inadequate releases of funds
80 Construction Of Ligada Makera Small Earth Dam   16,084,208 23,108,620.50        11,258,945.60 8,042,103.93          3,216,841.67 2018 2022 70%  Gidan Adede Gen. Ent. Ltd   2018 design stage     Untimely and inadequate releases of funds
81 Upgrading Of Hydrometeorological Stations Along Hadejia And Jama’are River System Kano, Jigawa And Bauchi States 12,027,000 8,370,401.88          4,170,952.70 4,170,952.70                          – 2017 2022 60%  One-One-Seven Nig. Ltd   2017       Untimely and inadequate releases of funds
82 Provision Of Plants And Machinery For Infrastructure Maintenance Kano State 57,057,000 79,016,700.00        20,117,100.00 20,117,100.00                          – 2017 2022 65%  Quadriple Constr. Co. Ltd   2017       Untimely and inadequate releases of funds
83 Land Holding Revalidation Survey In Kano River And Hadejia Valley Irrigation Projects Kano And Jigawa 12,597,000 13,260,000.00          7,558,200.00 7,558,200.00                          – 2017 2022 70%  Intergrated Land Survey Services   2017       Untimely and inadequate releases of funds
84 Establishment And Equipping Of Water Resources Information And Briefing Centre At Hjrbda Headquarters Kano State 24,852,000 246,612,660.00        14,911,200.00 7,455,600.00          7,455,600.00 2018 2022 50%  Amho Nig. Ltd   2018       Untimely and inadequate releases of funds
85 Settlement Of Outstanding Liabilities On Agricultural Facilities Kano State 182,299,743 0.00      181,455,903.06 0.00      181,455,903.06       Various           Payment Of Outstanding Liabilities
86 Purchase Of Motorised Drilling Rig And Pipes Kano State           169,945,748.44        60,000,000.00       (60,000,000.00) 2019 2021 75% Yanduna Ventures Nig. Ltd   2019       Untimely and inadequate releases of funds
87 Construction Of Classroom Blocks In Primary School In Alkaleri/Kirfi Lga Alkaleri/Kirfi Lga, Bauchi State             24,560,550.00          2,500,000.00        (2,500,000.00) 2019 2021 70% Royalstone Global Investment Nig. Ltd.   2019       Untimely and inadequate releases of funds
88 Construction Of Earth Dam At Danjaka,Bumai Ward Kano State Tsanyawa Lga, Kano State             39,207,854.70          6,020,000.00        (6,020,000.00) 2017 2021 100%   Land & Water Partnership Ltd 2017 under construction     Untimely and inadequate releases of funds
89 Improvement Of Dalili-Goribawa Rural Water Supply Scheme Kura Lga, Kano State             16,738,218.00          4,000,000.00        (4,000,000.00) 2018 2021 100% Phelyn Global Resources Ltd   2018       Untimely and inadequate releases of funds
90 Completion and Provision of Irrigation Charnels At Yanganau/Ungwar Wanzamai Dam, Tsanyawa LGA, Kano Tsanyawa Lga, Kano State             34,568,000.00          5,000,000.00        (5,000,000.00) 2018 2021   Asasco Nigeria Ltd   2018       Untimely and inadequate releases of funds
91 Contruction/Completion Of Jangefe Earth Dam In Kunchi Lga, Kano State Kunchi Lga, Kano State             50,740,582.93          1,666,049.21        (1,666,049.21) 2019 2021 100% Asasco Nigeria Ltd   2019 under construction     STUDY AND DESIGN
92 Drainage, Floond And Erosion Control In Jigawar Babura Babura Lga, Jigawa State   27,713,175.00   5,000,000.00        (5,000,000.00) 2018 2021 100% Sk And Sons Engr. Services Ltd   2018       Untimely and inadequate releases of funds
93 Supply And Installation Of Fire Safety Equipments Kano, Jigawa And Bauchi States   3,347,000.00   3,347,000.00        (3,347,000.00) 2019 2021 100% Usaini Alasan Baro General Ent. Ltd   2019       Untimely and inadequate releases of funds
94 Small Irrigation Scheme At Kankiya/Kusada/Ingawa Federal Constituency Kankiya/Kusada/Ingawa Lgas Katsina State   78,951,862.50   5,000,000.00        (5,000,000.00) 2021 2021 100% Nda Technical Services Ltd   2021   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
95 Studies And Design Of Desilting Of Birnin Kudu Dam, Birnin Kudu Lga, Jigawa State Birnin Kudu Lga, Jigawa State              3,000,000.00          1,200,000.00        (1,200,000.00) 2019 2021 100%  Lines And Dimensions Ltd   2019       Untimely and inadequate releases of funds
96 REHABILITATION OF 34nos. SMALL EARTH DAMS AT KANO, JIGAWA AND BAUCHI STATES KANO, JIGAWA AND BAUCHI STATES   37,925,779.50   4,292,100.00        (4,292,100.00) 2017 2021 70%  Glovesly Pro-Project Ltd   2017   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation Untimely and inadequate releases of funds
97 Reh. Works At Spillway Crossing Bridge Under Operations And Maintenance Of Challawa Gorge Dam Project Karaye Lga, Kano State   75,835,187.00   30,800,000.00       (30,800,000.00) 2017 2022 100% Ayh Investment Co. Ltd   2017       Untimely and inadequate releases of funds
98 Study And Design Of Panda/Hamdullahi/Hungu Erosion Control In Albasu Lga, Kano State Albasu Lga, Kano State   9,750,000.00   9,750,000.00        (9,750,000.00) 2019 2021 100%   Himma Tech. Services Ltd 2019       Untimely and inadequate releases of funds
99 Hadejia River Channel Improvement Project On Flood Control Hadejia Lga, Jigawa State 1,425,000                                – 12th October, 2021         12th October, 2021       Untimely and inadequate releases of funds
100 Channelisation Of River For Small Town Irrigation   1,425,000                                – 12th October, 2021         12th October, 2021       Untimely and inadequate releases of funds
101 Small Irrigation Scheme At Rano/Kibiya/Bunkure Federal Constituency Kano State Rano/Kibiya/Bunkure Lgas Kano State 1,425,000                                – 12th October, 2021         12th October, 2021   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
102 Small Irrigation Scheme At Kyarana – Kiru Lga Kiru Lga, Kano State 19,000,000 172,330,095.00        11,400,000.00 11,400,000.00                          – 2018 2021 70%  Potenzia Seed Ltd   2018   The project is farmer managed tubewell based irrigation scheme The project is farmer managetubewell based irrigation scheme Untimely and inadequate releases of funds
103 Establishment Of Jigawar Dan Ali Small Irrigation Scheme   19,000,000 18,970,525:00          5,700,000.00 0.00          5,700,000.00 12th October, 2021 2021   Abdurahaman Abdulhamid Ventures Ltd   12th October, 2021   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
104 Graduate Employment In Irrigated Agriculture Scheme Kano State 23,370,000 22,865,697:50          8,392,657.90 0.00          8,392,657.90 12th October, 2021     Century Trade Ltd   12th October, 2021       Untimely and inadequate releases of funds
105 River Enbankment Project At Asake, Zaki Federal Constituency Zaki Lga, Bauchi State 48,000,000 249,418,657:16        28,800,000.00 0.00        28,800,000.00 12th October, 2021 2022   AU Iya Global Ventures Ltd   12th October, 2021       Untimely and inadequate releases of funds
Consultancy Works   7,000,000.00   7,000,000.00        (7,000,000.00)         Gap Water Res. Consultants Ltd         Untimely and inadequate releases of funds
124 Malikawar Garu Dam/Irrigation Project  In Kano State Malikwa, Tsanyawa Lga, Kano State 120,000,000 248,460,533:31        84,000,000.00 0.00        84,000,000.00 12th October, 2021     Kago Nigeria Ltd   12th October, 2021 225mcm     Untimely and inadequate releases of funds
Consultancy Works   9,700,000.00   9,700,000.00        (9,700,000.00)         EMACS ENGR. CONSULTANTS LTD         Untimely and inadequate releases of funds
125 Gyauro Dam/Irrigation In Kano State Gyauro, Kano State 120,000,000 248,422,676:78        84,000,000.00 0.00        84,000,000.00 12th October, 2021     Ascom Global Ventures Ltd   12th October, 2021 150 mcm     Untimely and inadequate releases of funds
Consultancy Works 9,700,000.00   9,700,000.00        (9,700,000.00)         SIIS Engr. Consultants Ltd         Untimely and inadequate releases of funds
126 Maratayi/Kofar Gabas, Zangon Tagwai, Kawaji And Sauna Flood And Erosion Control In Kano State. Nassarawa Lga, Kano State 80,000,000 248,458,896:63        56,000,000.00 0.00        56,000,000.00 12th October, 2021     Haitel Nigeria Limited   12th October, 2021       Untimely and inadequate releases of funds
Consultancy Works 9,700,000.00   9,700,000.00        (9,700,000.00)         Pullad Global Consultants Ltd        
127 Sauna Kawaji Erosion Control And River Bank Reclamation Works (Left Bank), Nasarawa Lga, Kano State Nassarawa Lga, Kano State 40,000,000 248,048,385:30        24,000,000.00 0.00        24,000,000.00 12th October, 2021     Amho Nigeria Limited   12th October, 2021       Untimely and inadequate releases of funds
Consultancy Works 9,700,000.00   9,700,000.00        (9,700,000.00)         Pullad Global Consultants Ltd        
128 Construction Of Bichi Township Roads (4km) In Bichi Lga, Kano State. Bichi Lga, Kano State 80,000,000 249,629,512:50        52,000,000.00 0.00        52,000,000.00 12th October, 2021 2022   Belloh System Construction Ltd (BSC)   12th October, 2021       Untimely and inadequate releases of funds
Consultancy Works 9,700,000.00   9,700,000.00        (9,700,000.00)         SIIS Engr. Consultants Ltd        
129 Erosion And Flood Control At Gidan Mata Villiage In Kafin Hausa Lga Of Jigawa North East Senatorial District, Jigawa State Kafin Hausa Lga, Jigawa State 24,000,000 23,447,549:95        16,800,000.00 0.00        16,800,000.00 2021 2021   Mahadi Services and Resources   2021       Untimely and inadequate releases of funds
130 Construction Of Small Irrigation Schemes In Kankia/Kusada/Ingawa Federal Constituency, Katsina State.  Kankia/Kusada/Ingawa Lgas Katsina State 50,000,000 78,951,862.50        32,500,000.00 19,000,000.00        13,500,000.00 2019 2021 50% NDA TECHNICAL SERVICES LTD   2019       Untimely and inadequate releases of funds
Consultancy Works 6,000,000.00   6,000,000.00        (6,000,000.00)         HOMESMITH ENGR. LTD        
148 Erosion Control In Sara Town Gwaram Local Government Area, Jigawa South West Senatorial District, Jigawa State. Gwaram Lga 80,000,000 249,659,051.25        56,000,000.00 17,894,565.75        38,105,434.25 2021 2021   Schramm Global Services Ltd   2021       Untimely and inadequate releases of funds
Consultancy Works 9,835,000.00   9,835,000.00        (9,835,000.00)         Samaplus Engr. Constr. Ltd        
149 Repairs And Rehabilitation Of Gesto Dam In Kano North Senatorial Districts, Kano State. Kano State 32,000,000 0.00        16,000,000.00 0.00        16,000,000.00 12th October, 2021 2021   NEW   12th October, 2021 under rehabilitation     Untimely and inadequate releases of funds
150 Completion Of Small Irrigation Project At Tofa Lga Kano North Senatorial Districts, Kano State. Kano State 32,000,000 9,978,675.00        12,800,000.00 9,449,816.25          3,350,183.75 2019 2021 80% SK & SONS ENGR. SERVICES LTD   2019   The project is farmer managed tubewell based irrigation scheme The project is farmer managed tubewell based irrigation scheme Untimely and inadequate releases of funds
151 Purchase Of Mini Rice Mill Machine For Farmers And Cooperative Societies In Kano Kano State 160,000,000 182,372,257:90        64,000,000.00 29,965,087.50        34,034,912.50 12th October, 2021 2021   Channel Resources Services   12th October, 2021       Untimely and inadequate releases of funds
152 Construction Of Two Number Mini Bridges On Jeli And Anguwan Madaki Rural Access Roads Of Tudun Wada Lga, Kano State Tudun Wada Lga, Kano State 80,000,000 47,277,050.18        56,000,000.00 46,135,000.00          9,865,000.00 12th October, 2021 2021   Sat Engineering Services Ltd   12th October, 2021       Untimely and inadequate releases of funds
Consultancy Works 9,865,000.00   9,865,000.00        (9,865,000.00)         Emi Engr. Consultants Ltd      
153 Procurement And Supply Of Empowerment Materials On Agriculture And Small Scale Businesses For Women And Youth In Rano/Bunkure/Kibiya Federal Constituency, Kano State Rano/Bunkure/Kibiya Lgas Kano State 40,000,000 40,065,357:50        24,000,000.00 0.00        24,000,000.00 12th October, 2021 2021   Hilyco Nigeria Limited   12th October, 2021       Untimely and inadequate releases of funds
   TOTAL     3,296,079,790.00 8,519,314,045.40   2,092,072,494.65 1,221,204,309.96      870,868,184.69                    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.0 Constituency Projects executed in 2021

 

S/N PROJECT TITLE/LOCATION CONTRACTOR/ADRESS/PHONE NO DATE PROJECT COMMENCED COMPLETION DATE TOTAL PROJECT COST APPROPRIATION 2021 TOTAL AMOUNT RELEASED TOTAL AMOUNT COMMITED TO DATE TOTAL % RELEASED % COMPLETION
1 FANDA/HAMDULLAHI/HUNGU EROSION CONTROL AT ALBASU FEDERAL CONSTITUENCY OF KANO STATE M. SULUM NIG. LTD 12th October, 2020 2022         247,493,946.74             50,000,000.00             29,635,485.00          17,565,239.42                59.27  
2 SUPPLY OF WATER PUMP MACHINES IN MIGA/JAHUN FEDERAL CONSTITUENCY, JIGAWA STATE                     30,000,000.00             17,781,291.00                  59.27  
3 CONSTRUCTION OF 5NOS SOLAR POWERED AND HAND PUMPS BOREHOLES AND DRILLING OF 20NOS HAND PUMPS BOREHOLES IN AUYO/HADEJIA/KAFIN HAUSA FEDERAL CONSTITUENCY, JIGAWA STATE K & K INTEGRATED PROJECT AND INVEST. LTD 2019 2019            28,317,216.38             43,500,000.00             25,782,871.95             9,000,000.00                59.27  
4 DRILLING OF SOLAR OVERHEAD TANK BOREHOLES IN KAZAURE/RONI/GWIWA/YANKWASHI FEDERAL CONSTITUENCY, JIGAWA STATE                     11,000,000.00               6,519,806.70                  59.27  
5 CONSTRUCTION OF MINI COMPUTER VILLAGE AND GSM SALE AND REPAIR IN HADEJIA                     60,000,000.00             35,562,582.00                  59.27  
6 EMPOWERMENT OF YOUTH THROUGH COMMERCIAL MOTORCYCLES AND TRICYCLES IN JIGAWA NORTH EAST SENATORIAL DISTRICT, JIGAWA STATE                     50,000,000.00             29,635,485.00                  59.27  
7 SUPPLY OF WOMEN CENTRE TRADE AND EMPOWERMENT, SEWING MACHINES, GRINDERS AND FREEZERS IN JIGAWA NORTH EAST SENATORIAL DISTRICT, JIGAWA STATE                     70,000,000.00             41,489,679.00                  59.27  
8 PURCHASE OF 2 (TWO) BUSES FOR H.E COUNCIL IN JIGAWA NORTH EAST SENATORIAL DISTRICT, JIGAWA STATE                     20,000,000.00             11,854,194.00                  59.27  
9 RENOVATION OF SOLAR POWERED BOREHOLES IN JIGAWA NORTHWEST SENATORIAL DISTRICT, JIGAWA STATE                     50,000,000.00             29,635,485.00                  59.27  
10 CONSTRUCTION OF NEW SOLAR POWERED BOREHOLES IN JIGAWA NORTHWEST SENATORIAL DISTRICT, JIGAWA STATE                   164,000,000.00             97,204,390.80                  59.27  
11 CONSTRUCTION OF SOLAR POWERED BOREHOLES IN BIRNIWA AND GURI LGAs OF JIGAWA NORTH EAST SENATORIAL DISTRICT, JIGAWA STATE                     25,000,000.00             14,817,742.50                  59.27  
12 CONSTRUCTION OF DRAINAGES AND EARTH FILLING IN HADEJIA LGA OF JIGAWA NORTHEAST SENATORIAL DISTRICT, JIGAWA STATE                     15,000,000.00               8,890,645.50                  59.27  
13 DRILLING AND EQUIPPING OF HAND PUMPS AND SOLAR POWERED BOREHOLES WITH PVC TANKS ON DWARF WALL IN AUYO LGA IN JIGAWA NORTHEAST SENATORIAL DISTRICT, JIGAWA STATE                     25,000,000.00             14,817,748.04                  59.27  
14 CONSTRUCTION OF ARKET STALLS FOR FRUITS AND VEGETABLES HADEJIA IN JIGAWA NORTH EAST SENATORIAL DISTRICT,                     13,000,000.00               7,705,226.10                  59.27  
15 DRILLING OF HAND PUMPS BIRNIWA LGA IN JIGAWA NORTH EAST SENATORIAL DISTRICT, JIGAWA STATE                     13,000,000.00               7,705,226.10                  59.27  
                  275,811,163.12           639,500,000.00           379,037,858.69          26,565,239.42    
         

 

           
SUMMARY    
APPROPRIATION                                    –
1st TRANCHE          235,716,430.12  
2nd TRANCHE          143,321,428.57  
TOTAL RELEASE          379,037,858.69
% RELEASE                             59.27
UTILIZATION                                    –
% UTILIZATION                                    –
BALANCE ON RELEASE          379,037,858.69

 

 

 

 

 

4.0 Boreholes Constructed in 2021 (Name) Location, level of completion)

 

SN PROECT TITLE PROJECT DESCRIPTION LOCATION LEVEL OF COMPLETION %
1 ERGP10160765 CONSTRUCTION OF SOLAR POWERED BOREHOLES IN FARMING COMMINITIES OF YOBE STATE Y0BE STATE 95
2 ERGP19152200 CONSTRUCTION OF SOLAR POWERED BOREHOLES AT MATSAI AND SURROUNDING COMMUNITIES MATSAI, JIGAWA STATE 100
3 ERGP28151958 CONSTRUCTION OF RURAL WATER SUPPLY SCHEMES IN KANO, JIGAWA AND BAUCHI STATES KANO, JIGAWA AND BAUCHI STATES 95
4 ERGP28151964 WATER SUPPLY SCHEME AT UNGUWAR TSAMIYA, JIGAWA STATE TSAMIYA, JIGAWA STATE 100
5 ERGP28152109 BATALI WATER SUPPLY BATALI, JIGAWA STATE 100
6 ERGP28152121 PARTNERSHIP FOR EXPANDED WATER SANITATION AND HYGIENCE (PEWASH) KANO, JIGAWA AND BAUCHI STATES 75
7 ERGP28152134 REHABILITATION OF EXISTING BOREHOLES IN DAWAKIN TOFA LGA DAWAKIN TOFA LGA, KANO STATE 100
8 ERGP28152136 WATER TREATMENT PLANT AT SUMAILA LGA, KANO STATE SUMAILA LGA, KANO STATE 85
9 ERGP28152193 WATER SUPPLY SCHEME AT DUGABAU DUGABAU, KANO STATE 100
10 ERGP28152194 COMPLETION OF SOLAR POWERED BOREHOLE/HANDPUMP AT BURDUGAU, MALUMFASHI G AND INDUSTRIAL BOREHOLE AT PAJEWA, TAKAI LGA PAJEWA TAKAI LGA, KANO STATE 100
11 ERGP28152199 PROVISION OF SOLAR POWERED BOREHOLES AT GAHONI, GGSS, JBY, RIKO, KAURAKI, KADOBE, DUMA, BAKURA AND SORROUNDING VILLAGES GAHONI, GGSS, JBY, RIKO, KAURAKI, KADOBE, DUMA, BAKURA AND SORROUNDING VILLAGES, KATSINA STATE 100
12 ERGP28152205 REGIONAL WATER SUPPLY SCHEMES IN VARIOUS LOCATIONS IN THE CATCHMENT KANO, JIGAWA AND BAUCHI STATES 95
13 ERGP28152219 WATER SUPPLY SCHEME IMPROVEMENT AT VARIOUS LOCATIONS IN KANO KANO STATE 95
14 ERGP28152224 PROVISION OF 2NOS SOLAR POWERED BOREHOLES WITH 4NOS. PLASTIC TANKS AT YAN’BUTA KOFAR NASARAWA, KANO MUNICIPAL (PAYMENT OF LIABILITY) YAN’BUTA KOFAR NASARAWA, KANO MUNICIPAL, KANO STATE 100
15 ERGP28152229 IMPROVEMENT OF MAIGATARI WATER SUPPLY SCHEME MAIGATARI, JIGAWA STATE 85
16 ERGP28152238 SOLAR BOREHOLES IN DAN KANDAI, BAUCHI DAN KANDAI, BAUCHI STATE 100
17 ERGP28152240 GWARZO WATER SUPPLY SCHEME GWARZO, KANO STATE 100
18 ERGP28159065 WATER SUPPLY SCHEME, KANO NORTH KANO NORTH,KANO STATE 100
19 ERGP28159117 CONSTRUCTION OF RURAL WATER SUPPLY IN DAMBATTA, KORE, TABO, YAMMAWA, FAGWALAWA AND OTHER VILLAGES IN DAMBATTA LGA, KANO STATE DAMBATTA, KORE, TABO, YAMMAWA, FAGWALAWA AND OTHER VILLAGES IN DAMBATTA LGA, KANO STATE 96
20 ERGP28159120 CONSTRUCTION OF RURAL WATER IN KAUYEN MUJE, KANGIRE, BIRNIN KUDU, KURA AND OTHER VILLAGES IN JIGAWA STATE JIGAWA STATE 95
21 ERGP28159122 REPAIR OF BROKEN DOWN BOREHOLES AT YAKASAI YAKASAI, KANO STATE 100
22 ERGP28160156 CONSTRUCTION OF SOLAR POWERED AND HAND PUMP BORE HOLES IN KANO STATE KANO STATE 100
23 ERGP28160777 CONSTRUCTION OF 10 NOS HANDPUMP BOREHOLE IN BAGUDA YAKASAI, KANO STATE 100
24 ERGP8159053 WATER SUPPLY SCHEME IN BIRNIN KUDU AND GANTSA IN BIRNIN KUDU/BUJI FEDERAL CONSTITUENCY, JIGAWA STATE  BIRNIN KUDU, GANTSA, JIGAWA STATE 100
25 ERGP8159055 WATER SUPPLY SCHEME IN MALLAMMADORI/KAUGAMA FEDERAL CONSTITUENCY, JIGAWA STATE MALLAMMADORI/KAUGAMA, JIGAWA STATE 100
26 ERGP8159057 CONSTRUCTION OF 10NO. HANDPUMP BOREHOLES AT KURA TOWN.  KURA TOWN, KANO STATE 100
27 ERGP8159064 PROVISION OF WATER SUPPLY SCHEME AT GAYA/AJINGI FEDERAL CONSTITUENCY GAYA/AJINGI, KANO STATE 100
28 ERGP8159066 PROVISION OF HANDPUMP BOREHOLES IN ZAKI FEDERAL CONSTITUENCY, BAUCHI STATE ZAKI, BAUCHI STATE 100
29 ERGP8159067 PROVISION OF HANDPUMP BOREHOLES IN BIRNIWA/GURI/KIRIKASSAMMA FEDERAL CONSTITUENCY, JIGAWA STATE BIRNIWA, GURI,KIRIKASSAMMA, JIGAWA STATE 100
30 ERGP8159068 CONSTRUCTION/REHABILATION OF HANDPUMP BOREHOLES IN VARIOUS LAOCATIONS IN GEZAWA LGA, GEZAWA/GABASAWA FEDERAL CONSTITUENCY, KANO STATE GEZAWA,  GABASAWA, KANO STATE 100
31 ERGP8159069 CONSTRUCTION/REHABILATION OF HANDPUMP BOREHOLES IN VARIOUS LAOCATIONS IN GABASAWA LGA, GEZAWA/GABASAWA FEDERAL CONSTITUENCY, KANO STATE GEZAWA, GABASAWA, KANO STATE 100
32 ERGP8159070 CONTRUCTION OF SOLAR BOREHOLE IN JIGAWA NORTH WEST SENATORIAL DISTRICT, JIGAWA STATE JIGAWA NORTH WEST, JIGAWA STATE 100
33 ERGP8159072 PROVISION OF HAND PUMP BOREHOLES IN 11 LGAs OF KATSINA SOUTH SENATORIAL DISTRICT KATSINA SOUTH, KATSINA STATE 100
34 ERGP8159734 REHABILITATION OF WATER WORKS IN FUNTUA , KATSINA STATE FUNTUA , KATSINA STATE 100
35 ERGP554004418 CONSTRUCTION OF SOLAR POWERED BOREHOLES IN RINGIM EMIRATE, GUMEL EMIRATE AND KAZAURE EMIRATE IN JIGAWA NORTHWEST SENATORIAL DISTRICT, JIGAWA STATE JIGAWA NORTH-WEST, JIGAWA STATE 100
36 ERGP554004246 CONSTRUCTION OF NEW SOLAR POWERED BOREHOLES IN RINGIN EMIRATE, JIGAWA NORTH-WEST SENATORIAL DISTRICT, JIGAWA STATE. JIGAWA NORTH-WEST, JIGAWA STATE 100
37 ERGP554004248 CONSTRUCTION OF NEW SOLAR POWERED BOREHOLES IN GUMEL & KAZAURE EMIRATES IN JIGAWA NORTH-WEST SENATORIAL DISTRICT, JIGAWA STATE. JIGAWA NORTH-WEST, JIGAWA STATE 100
38 ERGP554003617 CONSTRUCTION OF SOLAR POWERED BOREHOLE IN BAUCHI SOUTH SENATORIAL DISTRICT BAUCHI SOUTH, BAUCHI STATE 100
39 ERGP554003431 CONSTRUCTION OF SOLAR POWERED BOREHOLES IN BAUCHI SOUTH SENATORIAL DISTRICT, BAUCHI STATE BAUCHI SOUTH, BAUCHI STATE 100
40 ERGP554003618 CONSTRUCTION OF HANDPUMP BOREHOLES IN BAUCHI SOUTH SENATORIAL DISTRICT,BAUCHI STATE BAUCHI SOUTH, BAUCHI STATE 100
41 ERGP554003987 PROVISION AND INSTALLATION OF SOLAR STREET LIGHTS IN SHANONO/BAGWAI FEDERAL CONSTITUENCY, KANO STATE SHANONO/BAGWAI, KANO STATE 95
42 ERGP554003517 WATER RETICULATION PROJECTS IN Z/KANWA AND OTHER LOCATIONS (SECTION I) Z/KANWA, YOBE STATE 98
43 ERGP554003518 WATER RETICULATION PROJECTS IN Z/KANWA AND OTHER LOCATIONS (SECTION II) Z/KANWA, YOBE STATE 98
44 ERGP554003296 INSTALLATION OF HAND PUMPS BOREHOLES TO COMMUNITIES OF SHANONO/ BAGWAI FEDERAL CONSTITUENCY, KANO STATE SHANONO, BAGWAI, KANO STATE 100
45 ERGP554003495 DRILLING OF SOLAR POWERED BOREHOLES IN KAUGAMA/M/MALAMADORI FEDERAL CONSTITUENCY OF JIGAWA STATE KAUGAMA, M/MALAMADORI, JIGAWA STATE 100
46 ERGP584003586 PROVISION OF MOTORISED BOREHOOLES TO GUMEL & MAIGATARI LGAs  GUMEL ,MAIGATARI LGAs, JIGAWA STATE 100
47 ERGP584003587 PROVISION OF MOTORISED BOREHOOLES TO SULE TANKARKAR & GAGARAWA LGAs SULE TANKARKAR, GAGARAWA LGAs, JIGAWA STATE 100
48 ERGP554003565 WATER TREATMENT PLANT AND RETICULATION IN SUMAILA LOCAL GOVERNMENT AREA, KANO SOUTH SENATORIAL DISTRICT, KANO STATE. SUMAILA, KANO STATE 85
49 ERGP554003773 CONSTRUCTION OF SOLAR POWER BOREHOLES IN GEZAWA/GABASAWA LOCAL GOVERNMENT, KANO STATE. GEZAWA, GABASAWA, KANO STATE 100
50 ERGP554003819 PROVISION OF HAND PUMP BOREHOLE AT VARIOUS LOCATIONS OF GIGINYU WARD, NASSARAWA L.G., KANO STATE.  NASSARAWA , KANO STATE. 100
51 ERGP554001889 DRILLING AND REHABILITATION OF HAND PUMPS BOREHOLES TO EASE THE HARDSHIP OF CONSTITUENTS IN HADEIJA/KAFIN HAUSA/AUYO FEDERAL CONSTITUENCY, KANO  HADEIJA,KAFIN HAUSA,AUYO, JIGAWA STATE 100

 

 

 

 

 

 

5.0 Photographs of the Projects Showing their Levels of Completion or Projects Commissioned In 2021

 

Challawa Gorge Dam Outlet

 

REHABILITATED HADEJIA BARRAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Shangu Small Earth Dam under Construction

 

 

Construction of Malikawar Garu Earth Dam

 

Automated Hydromet Station at Hantsu Bridge, Yakasawa Ringim LGA, Jigawa State

 

Installed Automated Hydromet Station at Yakasawa Hantsu Bridge, Ringim GA Jigawa state

 

 

 

 

 

 

 

 

 

Newly rehabilitated Tiga Dam outlet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tiga Dam New Automated Water Level Gauge

 

 

 

 

 

Part of the rehabilitated irrigation structures at Kano River Irrigation Project

 

 

 

 

 

Dry Season Farmland at Kadawa Farm Centre as part of the all-year round gainful employment activities

 

 

 

 

 

 

Installation of Solar Powered Pump Based Drip Irrigation at

Sawe Pilot Irrigation Scheme, Bauchi State in progress

 

 

 

 

 

 

Installation of Solar Powered Pump Based Drip Irrigation at

Sawe Pilot Irrigation Scheme, Bauchi State in progress

 

 

 

 

 

Installation of Solar Powered Pump Based Drip Irrigation at

Sawe Pilot Irrigation Scheme, Bauchi State in progress

 

 

 

 

 

 

Installation of Solar Powered Pump Based Drip Irrigation at

Sawe Pilot Irrigation Scheme, Bauchi State in progress

 

 

 

DRILLING OF TUBE WELLS AT ABUNABO FADAMA IN JIGAWA STATE

 

 

 

TESTING OF TUBE WELLS DRILLED AT ABUNABO AND ZINDI BAUCHI STATE

 

 

 

 

 

Construction of Water Supply Scheme at Katagum,

Zaki LGA Bauchi State

 

 

 

 

 

            

 

                       

6.0 Details of Revenue Generation in 2021

 
REVENUE SOURCE 2021 (N)
Land preparation (THS) 1,098,750.00
Land lease 613,875.00
Rent 2,620,600.00
Contract registration 7,280,000.00
Tender fee 5,480,645.00
Land Development Fees 18,168,036.25
Plant hire 5,000,000.00
Water charges 15,178,589.72
Others (Stores, auction, etc) 52,000.00
TOTAL 55,492,495.97

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.0 General Achievements not captured in 2.0 above

 

Formation of Water Users Association within irrigation schemes

 

8.0 General Challenges/constraints

 

Major Challenges

 

  • Deterioration of Authority’s major dams and irrigation Schemes with cost of rehabilitation far beyond annual budgetary provisions
  • Loss of irrigation command areas due to dilapidation of water delivery structures
  • Invasion of Hadejia Barrage and Ruwan Kanya reservoir by typha grass, prime rose and other devastating aquatic weeds
  • Lack of irrigation and extension support staff for the effective operation and maintenance of the irrigation Schemes and advisory services to farmers respectively.
  • Inadequate skilled technical manpower to manage Authority’s dams and irrigation projects due to continuous staff exit, retirement from service and deaths.
  • Lack of regular staff training for skill improvement due to insufficient budgetary allocations under the recurrent budget.
  • Relatively low revenue generation due to ageing revenue generating infrastructure/assets, inadequate staff and poor revenue collection logistics.
  • Inadequate budgetary provisions and late budgetary releases

 

 

 

 

 

 

 

 

 

 

                     9.0    Budget Analysis (Budgetary Allocation/Releases/Utilization for Capital, Recurrent-Overhead and

                               Personnel)

 

  
 

SN ITEMS  2021 CORE PROJECTS 2021 ZONAL INTERVENTION PROJECTS
1 APPROPRIATION        12,045,636,485.00  –
2 RELEASES        12,045,636,485.00         379,037,858.69
3 % RELEASES TO APPROPRIATION                                100.00                            59.27
4 TOTAL UTILIZATION TO RELEASES           8,133,031,962.08  –
5 % UTILIZATION TO RELEASES                                   67.52  –
  OUTSTANDING BALANCE           3,912,604,522.92         379,037,858.69

 

 

 

 

 

 

 

 

       
             

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10.0 Way Forward/Future Direction of the Authority

 

  • Immediate rehabilitation of major dams and irrigation infrastructure of the Authority to ensure their stability and safety as well as efficient service delivery to the farmers, increased food production and enhanced national food security.This is expected to be substantially addressed under the TRIMMING Projects.
  • Employment of skilled manpower for effective operations and maintenance of infrastructure at all levels.
  • Regular training and retraining of staff and full utilization of their potentials
  • Organization and capacity building of farmers to prepare them for effective participation in the management of their irrigation schemes
  • Reinvigoration of the revenue generation machinery and diversification of revenue sources.  The Authority has recently developed a blue print for improved revenue generation which among others includes the organization and strengthening of Water Users Associations (farmers) for their participation in system operation and maintenance as well as collection of water fees.  Other aspects of the blue print include diversification of revenue sources, review of rates/tariffs, and improvement of revenue collection and banking procedures, improved logistics support to revenue staff and close supervision and monitoring of revenue generation entities/units.
  • Promotion of Public Private Partnership (PPP) in the operation of Wudil Pilot Irrigation Scheme, Yamidi Pilot Farm, Sawe Pilot Irrigation Scheme, Galala Irrigation Scheme and Challawa Spring Water Venture.

 

 

 

2021 PERSONNEL MATTERS

 

SN TOTAL STAFF STRENGTH IN 2021 TOTAL STAFF STRENGTH OF AUTHORITY IN 2021 NO. STAFF RECRUITED IN 2021 NO. OF STAFF DISCIPLINED IN 2021 SPECIFIC ACHIEVEMENTS OF APPOINTMENT, PROMOTION AND DSICIPLNE DIVISION IN 2021 NO. OF DISCIPLINARY COMMITTEE MEETING HELD IN 2021 CHALLENGES REMARKS
Snr Jnr Snr Jnr Snr Jnr Snr Jnr
1 271 59 265 59 Nil Nil Nil  Nil  60 Nos. of Staff both senior and junior were promoted to various cadres and salary Grade Levels Nil  Non availability of funds to settle 2019/2021 promotion arrears Despite the numerical challenges, the Management of the Authority still aspire to achieve more.

 

 

2021 PERSONNEL MATTERS (Contd)

                               
SN NO. OF STAFF ADVANCED IN 2021 NO. OF CONVERSION MADE IN 2021 NO. OF DEATH RECORDED IN 2021 NO. OF STAFF THAT ABSCONDED IN 2021 NO. STAFF THAT WERE UPGRADED IN 2021 NO. OF STAFF WITHDRAWN FROM SERVICE IN 2021 NO. OF STAFF RETIRED VOLUNTARILY IN 2021 NO. OF STAFF THAT RESIGNED IN 2021 NO. OF STAFF THAT WERE DISMISSED IN 2021
Snr Jnr Snr Jnr Snr Jnr Snr Jnr Snr Jnr Snr Jnr Snr Jnr Snr Jnr Snr Jnr
1 4 Nil 2 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

 

 

BOARD / TRAINING / STAFF WELFAREMATTERS

 

SN NO. OF BOARD MEETING HELD IN 2021 SPECIFIC ACHIEVEMENT OF BOARD IN 2021 NO. OF STAFF THAT BENEFITED FROM TRAINING IN 2021 SPECIFIC ACHIEVEMENTS ON TRAINING DIVISION IN 2021 SPECIFIC ACHIEVEMENTS ON STAFF WELFARE IN 2021        CHALLENGES
Senior Junior Local International
1 4 Nil 10 It immensely contributes towards staff performances and productivities   Financial Constraints to sponsor staff for training such as full-time, seminars and workshops particularly International Training

2021 PENSION MATTERS

 

SN TOTAL NO. OF RETIREES UNDER UNIFIED PENSION SCHEME IN THE AUTHORITY’S PAYROLL IN 2021 TOTAL NO. OF RETIREES UNDER CONTRIBUTORY PENSION SCHEME IN 2021 NO. OF BOARD OF TRUSTEES (BOT) MEETINGS HELD IN 2021 AMOUNT RELEASED FOR PAYMENT IN OF PENSIONERS UNDER UNIFIED PENSION SCHEME IN 2021 ACTUAL AMOUNT PAID TO THE PENSIONERS UNDER UNIFIED PENSION SCHEME IN 2021 SPECIFIC ACNIEVEMENTS ON PENSION MATTERS IN 2021 CHALLENGES REMARKS
1 492 Nil Contact PTAD Contact PTAD Payment of monthly pension is running smoothly and also payment of 33% pension arrears have been settled by Pension Transitional Arrangement Directorate (PTAD) i. Nonpayment of gratuity of 2 respective pensioners.

ii. Omission of 1 pensioners from  November, 2016 to date

 There is a cordial relationship between Hadejia Jama’are River Basin Development Authority and PTAD

 

 

2019 ANNUAL REPORT

1.0     HADEJIA JAMA’ARE RIVER BASIN DEVELOPMENT AUTHORITY

Introduction

The Hadejia Jama’are River Basin Development Authority was created in 1976 along with ten other River Basin Development Authorities by the Federal Government of Nigeria under Decree 25 of same year.  Presently the Authority has the largest functional irrigation schemes among the twelve River Basin Development Authorities in the country covering 21,800 hectares. The Authority covers an area of 45,000km2 (whole of Kano and Jigawa States, and about two-thirds of Bauchi State) with an irrigation development potential of about 212,000 hectares within the Vallies of Hadejia and Jama’are Rivers.  The Administrative Headquarters of the Authority is located at Hotoro, Maiduguri Road, in Tarauni Local Government Area of Kano Municipality.

  1. Mission and Vision

In line with its statutory functions, the mission and vision of the Authority have been defined as thus:

1.1.1     Corporate Mission

Effective management of Water Resources for the development of socio-economic activities of the people within the basin through access to water for irrigation, domestic and other uses in a sustainable manner.

The ultimate aim is to efficiently utilize the available water resources with a view to improving the socio-economic status and quality of life, particularly, of the people living within the Authority’s catchments area through supply of water for irrigation, human and livestock consumption, fisheries development and industrial uses.

 

1.1.2     Vision

To be the River Basin Development Authority with the largest functioning infrastructures for agriculture, irrigation and water supply that meets the socio-economic needs of its clientele.

1.2       General Introduction of the Authority

  • The Hadejia Jama’are River Basin Development Authority was created in 1976 along with ten other River Basin Development Authorities by the Federal Government of Nigeria under Decree No. 25.of 1976
  • The Administrative Headquarters of the Authority is located at Hotoro, Maiduguri Road, in Tarauni Local Government Area of Kano Municipality.
  • The Authority covers an area of 45,000km2 (whole of Kano and Jigawa States, and about two-thirds of Bauchi State) with an irrigation development potential of about 212,000 hectares within the Vallies of Hadejia and Jama’are Rivers. 
  • Presently the Authority has the largest functional irrigation schemes (21,000 ha) among the twelve River Basin Development Authorities in the country.

1.3       Structure and Functions of the Authority

  • The Authority is responsible for the development of surface and underground water resources for irrigated agriculture, water supply and other uses within its catchment areas in Kano, Jigawa and Bauchi States.
  • The statutory functions of the Authority as contained in its enabling law as amended over time are as follows:
  • To undertake a comprehensive development of underground and surface water resources for multipurpose use with emphasis on provision of irrigation water.
  • To undertake schemes for erosion and flood control and for watershed management including afforestation and orchard development.
  • To construct, and maintain dams, dykes polders, wells, boreholes; and irrigation and drainage systems.
  • To provide water from reservoirs and lakes for irrigation purpose to farmers as well as urban and rural water supply.
  • To operate water legislation and control measures and development; and update water resources master plan of the area of Authority’s development and management, and
  • To undertake jobs on contract basis for Federal, States and Local Governments and private clients.

1.4        Photograph of the Chief Executive/Managing Director of the Authority as at Dec, 2019

 

Dr. Ado Khalid Abdullahi

Managing Director (HJRBDA), Kano.

4.04.          PHOTOGRAPHS OF SOME OF THE PROJECTS SHOWING THEIR LEVELS OF COMPLETION OR COMMISSIONED IN 2019

     

                     

            REHABILITATION WORKS AT HJRBDA HEADQUATERS 2019

DRILLING OF TUBE WELLS AT ABUNABO FADAMA IN JIGAWA STATE

TESTING OF TUBE WELLS DRILLED AT ABUNABO AND ZINDI

                                                            BAUCHI STATE

IMPROVEMENT OF KURA TOWNSHIP WATER SUPPLY            KANO STATE

UNIVERSITY OF DUTSE EROSION CONTROL PROJECTS

REMOVAL OF TYPHA AND OTHER AQUATIC WEEDS IN GURI / KIRIKASAMMA

 REMOVAL OF TYPHA AND OTHER AQUATIC WEEDS IN GURI / KIRIKASAMMA

                               REMOVAL OF TYPHA AND OTHER AQUATIC WEEDS

                       REPAIRS OF TIGA DAM OUTLET CONTROL STRUCTURE

                      REPAIRS OF TIGA DAM OUTLET CONTROL STRUCTURE

                       TIGA DAM OUTLET SLOPE PROTECTION WORKS

                    TIGA DAM OUTLET SLOPE PROTECTION WORKS

6.0   GENERAL ACHIEVEMENTS

CORE PROJECTS 2019

SN  PROJECT TITLE  PROJECT LOCATION/STATE CONTRACT SUM (N) CONTRACTOR  APPROPRIATION AMOUNT RELEASED UTILISATION STATUS (NEW/ONGOING) REMARKS
1 FLOOD AND EROSION CONTROL WORKS AT BEHUN, YAMBARAU, BUSAYE DAWAKIN KUDU LGA, KANO STATE 250,762,682.04  CENTURY TRADE LTD 237,985,147.00 66,143,420.51 66,143,420.51 ONGOING  
2 REHABILITATION OF HJRBDA HEADQUARTERS AND IRRIGATION SCHEMES MANAGEMENT OFFICES IN KANO, JIGAWA AND BAUCHI STATES KANO, JIGAWA AND BAUCHI STATES 85,603,519.05 ABDULRAHMAN ABDULHAMID VENTURES LTD 78,000,000.00 47,298,911.87 47,298,911.87 ONGOING  
3 CONSTRUCTION OF RURAL WATER SUPPLY SCHEME IN DANBATTA, KORE TABO, YAMMAWA, FAGWALAWA AND OTHER VILLAGES IN DANBATTA LGA, KANO STATE KANO, JIGAWA AND BAUCHI STATES 211,845,491.88 ISA HALILU NIG. LTD 32,080,200.00 29,832,080.00 29,832,080.00 ONGOING  
4 CONSTRUCTION OF RURAL WATER SUPPLY SCHEME IN KAUYEN MUJE, KANGIRE, BIRNIN KUDU, KURA AND OTHER VILLAGES IN JIGAWA STATE KAUYEN MUJE, KANGIRE, BIRNIN KUDU, KURA AND OTHER VILLAGES IN JIGAWA STATE 223,232,929.25 VIKUM NIG. LTD 30,042,900.00 26,619,721.25 26,619,721.25 ONGOING  
5 CONSTRUCTION OF RURAL WATER SUPPLY SCHEMES IN KANO, JIGAWA AND BAUCHI STATES KANO, JIGAWA AND BAUCHI STATES 22,748,598.97 HAUDA ASSOCIATES LTD 18,410,100.00 9,305,359.25 9,305,359.25 ONGOING  
6 IMPROVEMENT OF WATER SUPPLY IN WALAWAI, DANMARKE AND RAMIN KWALABE COMMUNITIES IN HOTORO, KANO STATE HOTORO, KANO STATE 8,580,000.00  USAINI ALASAN BARO GEN. ENT. LTD 8,580,000.00 1,287,000.00 1,287,000.00 ONGOING  
7 UPGRADING AND EXPANSION OF CHALLAWA SPRING WATER PROCESSING AND BOTTLING PLANT TURAWA IN CHALLAWA, KARAYE LGA, KANO STATE 91,114,772.96 MANAJEE ENGR. LTD 12,060,000.00 1,492,600.77 1,492,600.77 ONGOING  
8 SMALL WATER SCHEMES AT KURAWA, YOLA, K/SANI AND LARABAWA, KANO STATE KURAWA, YOLA, K/SANI AND LARABAWA, KANO STATE 14,881,545.44  LINES AND DIMENSION NIG. LTD 15,660,000.00 5,000,000.00 5,000,000.00 ONGOING  
9 IMPROVEMENT OF KURA TOWNSHIP WATER SUPPLY SCHEME KURA LGA, KANO STATE 234,347,208.28 CHANNEL RESOURCES SERVICES LTD 103,544,880.00 70,784,824.91 70,784,824.91 ONGOING  
10 IMPROVEMENT OF DALILI-GORIBAWA RURAL WATER SUPPLY SCHEME KURA LGA, KANO STATE 24,286,374.00  PHELYN GLOBAL RESOURCES LTD 19,970,100.00 5,025,970.00 5,025,970.00 ONGOING  
11 CONSTRUCTION OF KWANA UKU-TIGA RURAL WATER SUPPLY SCHEME TIGA, BEBEJI LGA, KANO STATE 6,788,880.00  LINES AND DIMENSION NIG. LTD 6,937,200.00 6,260,908.50 6,260,908.50 COMPLETED  
12 CONSTRUCTION OF HAND PUMP BOREHOLES IN RURAL COMMUNITIES OF GALADI, JOBI, DANGWANKI, GARIN BARKA, KUKA YESKU, DANKUMBO AND OTHER VILLAGES IN JIGAWA STATE GALADI, JOBI, DANGWANKI, GARIN BARKA, KUKA YESKU, DANKUMBO AND OTHER VILLAGES IN JIGAWA STATE 242,328,342.38 G-ONE VENTURES LTD 26,990,100.00 24,796,040.00 24,796,040.00 ONGOING  
13 BOREHOLES AT YAN’TANDU (PAYMENT FOR LIABILITY) AND CONSTRUCTION OF INDUSTRIAL BOREHOLE/RETICULATION AT PAJEWA VILLAGE, TAKAI LGA TAKAI LGA, KANO STATE 0  NEW 1,500,000.00 0 0 NEW  
14 RURAL WATER SUPPLY SCHEME IN TUDUN GUNSAU AND BAWAN KANON HAUSAWA IN WUDIL AND GARKO LGAs., KANO STATE WUDIL/GARKO FEDERAL CONSTITUENCY 1,500,000.00  YAMIL CONSTRUCTION CO. LTD 1,500,000.00 0 0 NEW  
15 REGIONAL WATER SUPPLY SCHEME AT FUTUK ALKALERI LGA, BAUCHI STATE FUTUK, ALKALERI LGA, BAUCHI STATE 0  NEW 1,500,000.00 0 0 NEW  
16 SMALL IRRIGATION SCHEME AT MALAM MADORI/ KAUGAMA FEDERAL CONSTITUENCY, JIGAWA STATE MALAM MADORI/ KAUGAMA FEDERAL CONSTITUENCY, JIGAWA STATE 0  NEW 1,500,000.00 0 0 NEW  
17 REGIONAL WATER SUPPLY IN WUDIL , BARKUM TOWN AND DAN’BATTA LGAs  KANO STATE WUDIL AND DANBATTA LGAs  KANO STATE 0  NEW 1,500,000.00 0 0 NEW  
18 PARTNERSHIP FOR EXPANDED WATER SANITATION AND HYGIENCE (PEWASH) KANO STATE 0  NEW 1,500,000.00 0 0 NEW  
19 SUPPLY OF IRRIGATION PUMPS AND ACCESSORIES IN SELECTED LOCATIONS IN KANO KANO STATE 134,589,900.00  ABDURRAHMAN ABDULHAMID VENTURES LTD 145,685,089.00 36,272,475.00 36,272,475.00 NEW  
20 PROVISION AND CONSTRUCTION OF SOLAR AND HAND PUMP BOREHOLES IN SELECTED COMMUNITIES IN KANO STATE KANO STATE 183,336,399.21  LOYALTY PROPERTIES LTD 188,754,438.00 45,834,099.80 45,834,099.80 NEW  
21 SUPPLY OF HAND PUMPS AND ACCESSORIES FOR REPLACEMENT OF THE DAMAGED BOREHOLES IN VARIOUS LOCATIONS GARUN MALLAM LGA 191,952,728.82  FAXCO NIG. LTD 191,358,412.00 33,180,409.32 33,180,409.32 ONGOING  
22 SUPPLY OF SOLAR BOREHOLES SUBMERSIBLE PUMPS AND SOLAR PANELS FOR VARIOUS REPLACEMENTS KANO NORTH SENATORIAL DISTRICT, KANO STATE 163,527,343.35  ASCOM GLOBAL VENTURES LTD 165,456,328.00 40,881,835.84 40,881,835.84 NEW  
23 CONSTRUCTION OF RURAL ACCESS ROADS YAMBARAU, TASA AND U/DUNIYA DAMS KANO SOUTH SENATORIAL DISTRICT 247,856,482.23  DASNA INTERNATIONAL CO. LTD 244,875,963.00 63,416,870.56 63,416,870.56 NEW  
24 ESTABLISHMENT OF MODEL FARM CENTRE BASED ON SONGHAI MODEL WUDIL LGA 0  NEW 81,060,000.00 0 0 ONGOING  
25 EMPOWERMENT PROGRAMME FOR THE PEOPLE OF KANO NORTH SENATORIAL DISTRICT, KANO STATE KANO SOUTH SENATORIAL DISTRICT 136,179,750.00  UYK NIG. LTD 50,000,000.00 50,000,000.00 50,000,000.00 ONGOING  
26 WATER TREATMENT PLANT AND RETICULATION IN SUMAILA LGA, IN KANO SOUTH SENATORIAL DISTRICT, KANO STATE. KANO SOUTH SENATORIAL DISTRICT 257,158,348.20  CHANNEL RESOURCES SERVICES LTD 150,000,000.00 41,321,002.23 41,321,002.23 ONGOING  
27 CONSTRUCTION OF ACCESS ROAD IN KIYAWA LGA, JIGAWA SOUTH WEST SENETORIAL DISTRICT, JIGAWA STATE  KIYAWA LGA, JIGAWA SOUTH WEST SENETORIAL DISTRICT, JIGAWA STATE 259,409,051.25  SCHRAMM GLOBAL SERVICES LTD 166,909,250.00 22,540,925.00 22,540,925.00 NEW  
28 CONSTRUCTION OF HAND PUMPS AT KANO SOUTH SENATORIAL DISTRICT TUDUN WADA/DOGUWA FEDERAL CONSTITUENCY, KANO STATE 60,487,560.00  KIG GLOBAL & CONSTR. CO. LTD 73,000,000.00 12,000,000.00 12,000,000.00 NEW  
29 PURCHASE OF MOTORISED DRILLING RIG AND PIPES KANO SOUTH SENATORIAL DISTRICT 169,945,748.44  YANDUNA VENTURES NIG. LTD 170,000,000.00 42,486,437.11 42,486,437.11 NEW  
30 SUPPLY OF 50 NOS. LAPTOPS TO KANO SOUTH SENATORIAL DISTRICT KANO SOUTH SENATORIAL DISTRICT 44,276,400.00  AKG GLOBAL MULTISERVICE LTD 45,000,000.00 0 0 NEW  
31 CONSTRUCTION OF KATAGUM TOWN WATER SUPPLY IN ZAKI FED. CONST., KATAGUM, BAUCHI STATE  ZAKI FED. CONST., KATAGUM, BAUCHI STATE 101,120,820.17 HILYCO NIGERIA LTD 60,000,000.00 14,000,000.00 14,000,000.00 NEW  
32 PROCUREMENT OF EMPOWERMENT ITEMS AND INSFRACTURAL DEVELOPMENT IN KANO KANO NORTH SENATORIAL DISTRICT 175,857,018.75  SINTI NIGERIA LTD 100,000,000.00 28,912,209.63 28,912,209.63 ONGOING SETTLEMENT OF 2018 OUTSTAINDING LIABILITY
33 CONSTRUCTION OF SHANGU SMALL EARTH DAM AND IRRIGATION SCHEME AT RANO/KIBIYA/BUNKURE FEDERAL CONTITUENCY, KANO RANO/KIBIYA/BUNKURE FEDERAL CONTITUENCY, KANO 248,375,693.55  S.TABAWA NIGERIA LTD 150,000,000.00 79,828,381.08 79,828,381.08 NEW  
34 REHABILITATION OF EXISTING RURAL WATER SUPPLY SCHEME IN TUDUN WADA/DOGUWA LGA, KANO STATE TUDUN WADA/DOGUWA LGA, KANO STATE 146,597,010.00 M-SULUM NIG. LTD 100,000,000.00 40,000,000.00 40,000,000.00 ONGOING  
35 CONSTRUCTION OF TIGA DAM CATCHMENT ACCESS ROAD PHASE 1 FROM WURAWURA-YANLABI IN TUDUN WADA LGA, KANO STATE WURAWURA-YANLABI IN TUDUN WADA LGA, KANO STATE 250,241,545.21  SAT ENGINEERING SERVICES LTD 40,000,000.00 5,700,000.00 5,700,000.00 ONGOING  
36 RECOSTRUCTION AND/DREDGING OF MAIGWADO EARTH DAM IN IN DOGUWA LGA, KANO STATE MAIGWADO, DOGUWA LGA, KANO STATE 107,411,745.22 MIMO INDUSTRIES LTD 30,000,000.00 0 0 NEW  
37 CONSTRUCTION OF BULKADIR SHUWAKI BRIDGE IN TUDUN WADA LGA, KANO STATE BULKADIR SHUWAKI, TUDUN WADA LGA KANO STATE 47,277,050.18 SAT ENGINEERING SERVICES LTD 20,000,000.00 0 0 NEW  
38 CONSTRUCTION OF CONCRETE DRAINAGE TO CONTROL GULLEY EROSION AT TSANYAWA/RUFAI, DOGUWA LGA, KANO STATE TSANYAWA RUFAI, DOGUWA LGA, KANO STATE 225,544,025.70  KAGO NIG. LTD 30,000,000.00 0 0 NEW  
39 CONSTRUCTION OF TAFGA EARTH DAM IN DOGUWA LGA, KANO STATE BEBEJI LGA, KANO STATE 525,467,716.03 RHOZETA NIG. LTD 200,000,000.00 71,208,606.93 71,208,606.93 ONGOING  
40 CONSTRUCTION OF A MINI BRIDGE AT SARKIN KURMI WITH ROAD SAND FILLING IN DOGUWA LGA, KANO STATE DOGUWA LGA, KANO STATE 52,912,058.85 SAT ENGINEERING SERVICES LTD 20,000,000.00 0 0 ONGOING  
41 CONSTRUCTION OF SMALL IRRIGATION SCHEME IN TOFA LGA TOFA LGA, KANO STATE 9,978,675.00  SK AND SONS ENGR. SERVICES LTD 10,000,000.00 0 0 NEW  
42 PROVISION OF MOTORISED BOREHOLES WITH PLASTIC TANK AND GENERATOR AT MISAU/DAMBAM FEDERAL CONSTITUENCY, BAUCHI STATE MISAU AND DAMBAM LGAs, BAUCHI STATE 4,436,431.65  HILYCO NIGERIA LTD 4,500,000.00 3,515,935.55 3,515,935.55 NEW  
43 MOTORISE BOREHOLE WITH LIMITED RETICULATION AT FILIN IDI, JIGAWA STATE FILIN IDI, JIGAWA STATE 8,527,929.56  TALAKU INTEGRATED SERVICES LTD 10,000,000.00 4,000,000.00 4,000,000.00 NEW  
44 PROCUREMENT OF HANDPUMPS WATER IRRIGATION MACHINES AND SOLAR PUMPS IN JIGAWA NORTH WEST SENATORIAL DISTRICT, JIGAWA STATE JIGAWA NORTH SENATORIAL DISTRICT, JIGAWA STATE 49,196,035.88  MUTUAL INFRASTRUCTURE LTD 50,000,000.00 4,919,603.59 4,919,603.59 NEW  
45 WOMEN AND YOUTH EMPOWERMENT IN AGRICULTURAL FARMING IN JIGAWA NORTHWEST SENATORIAL DISTRICT, JIGAWA STATE JIGAWA NORTH WEST SENATORIAL DISTRICT, JIGAWA STATE 49,565,250.00  S.TABAWA NIGERIA LTD 50,000,000.00 4,956,525.00 4,956,525.00 NEW  
46 SETTLEMENT OF LIABILITY ON SMALL IRRIGATION AT GORBOBO AND KANGAMA (2016) GORBOBO AND KANGAMA 27,247,500.00 YAYARI VENTURES NIG. LTD 25,000,000.00 15,000,000.00 15,000,000.00    
47 SETTLEMENT OF LIABILITY ON DRILLING AND EQUIPING OF 2NOS SOLAR POWERED BOREHOLES, 45M3 OVERHEAD TANK WITH LIMITED RETICULATION AT GURI LOCAL GOVERNMENT AREA (2011) GURI LGA, JIGAWA STATE 18,241,229.28  ALJAZEERA AGRO ALLIED NIG. LTD 25,000,000.00 3,821,008.20 3,821,008.20    
48 SETTLEMENT OF LIABILITY ON PROVISION OF WATER SCHEMES IN GAMAWA FEDERAL CONSTITUENCY, BAUCHI STATE (2017) GAMAWA LGA, BAUCHI STATE 13,936,020.00 MUHAY NIG. LTD 25,000,000.00 10,000,000.00 10,000,000.00    
49 SETTLEMENT OF LIABILITY ON SMALL FAMER FOOD PROVISION PROGRAMME THROUGH SPRINKLER IRRIGATION BASED SCHEMES AT JIGAWA  DAN ALI, MAIFEFE IN BABIYA L.G.A. 2017 JIGAWAR DAN AI, MAI LEFE, KIBIYA LGA, 19,707,660.00 DANGYATUM WATER VENTURES LTD 15,000,000.00 6,000,000.00 6,000,000.00    
50 SOLAR POWERED BOREHOLE AT BAKIN ZARBAI, BEBEJI LGA, KANO STATE BAKIN ZARBAI, BEBEJI LGA, KANO STATE 9,696,708.00  MA  NUMBA GLOBAL INVEST. 9,800,000.00 0 0 NEW  
51 SETTLEMENT OF LIABILITY ON CONSTRUCTION OF ICT CENTRE, HADEJIA 2016 HADEJIA LGA, JIGAWA STATE 48,980,006.33  MAKBLO INTEGRATED SERVICES LTD 6,000,000.00 0 0    
52 SETTLEMENT OF LIABILITY ON PROCUREMENT FOR THE SUPPLY OF HAND PUMP TO JIGAWA NORTH EAST SENATORIAL ZONE (2016) JIGAWA NORTH EAST, JIGAWA STATE 39,907,350.00  SLIM-FLAZAS NIG. LTD 8,000,000.00 3,200,000.00 3,200,000.00    
53 SETTLEMENT OF LIABILITY ON REHABILITATION OF KANO RIVER IRRIGATION INFRASTRUCTURES (2016) KURA, KANO STATE 26,922,000.00  RAFJAF NIGERIA LTD 25,000,000.00 10,000,000.00 10,000,000.00    
54 IMPROVEMENT OF KURA TOWNSHIP WATER SCHEME KURA, KANO STATE 26,646,212.25  CHANNEL RESOURCES SERVICES LTD 30,000,000.00 0 0 ONGOING  
55 REHABILITATION OF 50NOS HAND PUMP BOREHOLES IN KANO SOUTH SENATORIAL DISTRICT, KANO STATE KANO SOUTH SENATORIAL DISTRICT 24,151,365.00  KIG GLOBAL & CONSTR. CO. LTD 25,000,000.00 0 0 NEW  
56 PROVISION OF 50AH DABURAU DALA IRRIGATION PROJECT, MADOBI LGA, KANO STATE DABURAU DALA, MADOBI LGA, KANO STATE 74,552,375.63 BEACON ENGR. CO. LTD 35,000,000.00 30,348,547.90 30,348,547.90 NEW  
57 COMPLETION AND PROVISION OF IRRIGATION CHARNELS AT YANGANAU/UNGWAR WANZAMAI DAM, TSANYAWA LGA, KANO STATE YANGANAU/UNGWAR WANZAMAI DAM, TSANYAWA LGA, KANO STATE 34,568,000.00  ASASCO NIGERIA LTD 35,000,000.00 5,223,172.50 5,223,172.50 NEW  
58 SUPPLY OF 3″ IRRIGATION PUMPING MACHINES AND ACCESSORIES IN GORGARAM GORGARAM 9,403,800.00  JALATUS WORLDWIDE SERVICES 10,000,000.00 0 0 NEW  
59 CONSTRUCTION OF SOLAR POWERED BOREHOLE IN GARIN JARMAI, DAMBAM LGA GARIN JARMAI, DAMBAM LGA, BAUCHI STATE 9,716,332.50  MAIMAKANI NIGERIA LTD 10,000,000.00 1,457,449.88 1,457,449.88 NEW  
60 CONSTRUCTION/COMPLETION OF JANGEFE EARTH DAM, KUNCHI LGA, KANO STATE JANGEFE, KUNCHI LGA, KANO STATE 52,240,582.93  ASASCO NIGERIA LTD 25,000,000.00 6,574,058.29 6,574,058.29 NEW  
61 COMPLETION/CONSTRUCTION OF HARBAU EARTH DAM, TSANYAWA LGA, KANO STATE HARBAU, TSANYAWA LGA, KANO STATE 75,363,244.26  ASASCO NIGERIA LTD 25,000,000.00 7,573,626.05 7,573,626.05 ONGOING  
62 COMPLETION OF KWARWA DAM, TSANYAWA LGA, KANO STATE KWARWA, TSANYAWA LGA, KANO STATE 36,300,042.92 KAGO NIGERIA LTD 20,000,000.00 3,000,000.00 3,000,000.00 NEW  
63 PROVISION OF MOTORIZED WATER PUMP AT HADEJIA, HADEJIA LGA, JIGAWA STATE HADEJIA LGA, JIGAWA STATE 8,542,650.63  FINNATECH NIG.LTD 10,000,000.00 854,265.06 854,265.06 NEW  
64 PROVISION OF BOREHOLE IN TSANYAWA/KUNCHI CONSTITUENCY TSANYAWA AND KUNCHI LGAs, KANO STATE 8,623,113.24  GENUINE INFRASTRUCTURES NIG. LTD 10,000,000.00 862,311.32 862,311.32 NEW  
65 CONSTRUCTION OF BRIDGE/CULVERT IN GORGARAM, JAKUSKO LOCAL GOVERNMENT AREA OF YOBE STATE GORGARAM, JAKUSKO LGA, YOBE STATE 20,980,974.11  MA NUMBU 20,000,000.00 0 0 NEW  
66 SETTLEMENT AND COMPLETION OF THE REPAIRS AND REHABILITATION OF GETSO DAMS PROJECT IN KANO NORTH SENATORIAL DISTRICT. ONGOING GETSO, GWARZO LGA, KANO STATE 10,000,000.00  KAWAJI GLOBAl CONCEPT LTD 10,000,000.00 2,000,000.00 2,000,000.00 ONGOING  
67 DRAINAGE, FLOOND AND EROSION CONTROL IN JIGAWAR BABURA JIGAWAR BABURA, JIGAWA STATE 27,713,175.00  SK AND SONS ENGR. SERVICES LTD 28,000,000.00 2,771,317.50 2,771,317.50 NEW  
68 CONSTRUCTION OF 3NOS SOLAR POWERED BOREHOLES IN GARUN BABBA, GARUN MALLAM AND YADA KWARI IN GARUN MALLAM LGA, KANO STATE GARUN BABBA, GARUN MALLAM AND YADA KWARI IN GARUN MALLAM LGA, KANO STATE 18,049,556.25  KAWAJI GLOBAl CONCEPT LTD 20,000,000.00 0 0 NEW  
69 MOTORISED BOREHOLE WITH PLASTIC AND GENERATOR AT MALAM MADORI/KAUGAMA FEDERAL CONSTITUENCY, JIGAWA STATE MALAM MADORI/KAUGAMA FEDERAL CONSTITUENCY, JIGAWA STATE 4,500,000.00  NABSON TECH. SERVICES LTD 4,500,000.00 0 0 NEW  
70 CONSTRUCTION OF 10NOS. TUBE WELLS IN FANDAKAI, BEBEJI LGA, KANO STATE FANDAKAI, BEBEJI LGA, KANO STATE 9,700,000.00  KAWAJI GLOBAl CONCEPT LTD 9,700,000.00 970,000.00 970,000.00 NEW  
71 REHABILITATION OF EXISTING BOREHOLES IN DAWAKIN TOFA TOWN, KANO STATE DAWAKIN TOFA, KANO STATE 7,950,000.00  DUMBA BUSINESS SOLUTIONS LTD 8,000,000.00 7,406,077.80 7,406,077.80 NEW  
72 PROVISION OF MOTORISED BOREHOLE WITH PLASTIC TANK AND GENERATOR AT ANGWAR MARYAM, TAFAWA BALEWA, BAUCHI STATE ANGWAR MARYAM, TAFAWA BALEWA, BAUCHI STATE 4,500,000.00  YAMIL CONSTRUCTION CO. LTD 4,500,000.00 0 0 NEW  
73 SOLAR POWERED BOREHOLE AT BURDUGAU (G), MALUMFASHI LGA, KATSINA STATE BURDUGAU (G), MALUMFASHI LGA, KATSINA STATE 9,522,024.37 UMZAK INTERNATIONAL CO. LTD 10,000,000.00 952,202.44 952,202.44 NEW  
74 SOLAR POWERED BOREHOLE AT GUNGULU TIFFI WARD NINGI LGA, BAUCHI STATE  GUNGULU TIFFI WARD NINGI LGA, BAUCHI STATE 9,001,102.22  MUTUAL INFRASTRUCTURE LTD 10,000,000.00 900,110.22 900,110.22 NEW  
75 STUDY AND DESIGN OF SMALL EARTH DAMS IN KANO, JIGAWA AND BAUCHI STATES KANO, JIGAWA AND BAUCHI STATES 29,015,573.79 PHASE ASSOCIATES LTD 15,060,000.00 11,958,565.58 11,958,565.58 ONGOING  
76 STUDY AND DESIGN OF SMALL IRRIGATION SCHEMES IN KANO, JIGAWA AND BAUCHI STATES KANO, JIGAWA AND BAUCHI STATES 30,000,000.00 GLOBAL PROJECT CONSORTIUM 15,060,000.00 10,000,000.00 10,000,000.00 ONGOING  
77 STUDY AND DESIGN OF WATER SUPPLY PROJECTS KANO, JIGAWA AND BAUCHI STATES 23,823,789.07 GAP WATER RESOURCES LTD 12,660,000.00 6,000,000.00 6,000,000.00 ONGOING  
78 COMPLETION OF DATA BANK AND MANAGEMENT INFORMATION SYSTEMS HOTORO, KANO STATE 8,251,425.00 BOOLEAN COMPUTERS NIG LTD 7,200,000.00 1,275,000.00 1,275,000.00 ONGOING  
79 ESTABLISHMENT AND EQUIPPING OF ENGINEERING DESIGN OFFICE HOTORO, KANO STATE 17,768,123.25 QL TEKNIK LTD 6,360,000.00 6,360,000.00 6,360,000.00 ONGOING  
80 SOLAR POWERED BOROHOLE AT YAKASAI QUARTERS KANO MUNICIPAL YAKASAI, KANO MUNICIPAL, KANO STATE 8,974,074.38 UMZAK INTERNATIONAL CO. LTD 10,000,000.00 897,407.44 897,407.44 ONGOING  
81 WATER SUPPLY SCHEME IN BIRNIWA/GURI/KIRIKASSAMMA FEDERAL CONSTITUENCY, JIGAWA STATE BIRNIWA/GURI/KIRIKASSAMMA FEDERAL CONSTITUENCY, JIGAWA STATE 9,102,616.95 SABA INTEGRATED RESOURCES LTD 10,000,000.00 0 0 NEW  
82 WATER SUPPLY SCHEME AT WUDIL/GARKO FEDERAL CONSTITUENCY, KANO STATE WUDIL/GARKO FEDERAL CONSTITUENCY, KANO STATE 24,723,145.76 DANGARKO NIG. LTD 25,000,000.00 0 0 NEW  
83 PROVISION OF HANDPUMP BOREHOLES AT JAMA’ARE/ITAS GADAU FEDERAL CONSTITUENCY, BAUCHI STATE JAMA’ARE/ITAS GADAU FEDERAL CONSTITUENCY, BAUCHI STATE 8,920,903.95 HAUDA ASSOCIATES LTD 10,000,000.00 0 0 NEW  
84 SUPPLY OF IRRIGARITION PUMPS TO GOMBE/KWAMI/FUNAKAYE FEDERAL CONSTITUENCY, GOMBE STATE GOMBE/KWAMI/FUNAKAYE FEDERAL CONSTITUENCY, GOMBE STATE 19,973,100.00 SK AND SONS ENGR. SERVICES LTD 20,000,000.00 0 0 NEW  
85 MOTORISED BOREHOLE AT KIBIYA LGA, KANO STATE KIBIYA LGA, KANO STATE 8,792,023.15 YAYARI VENTURES NIG. LTD 10,000,000.00 0 0 NEW  
86 PROVISION OF SOLAR POWERED BOREHOLE AND HANDPUMP AT YANKABA NASARAWA FEDERAL CONSTITUENCY, KANO STATE  YANKABA NASARAWA FEDERAL CONSTITUENCY, KANO STATE 9,418,959.03 G.S.E.S NIG. LTD 10,000,000.00 0 0 NEW  
87 ESTABLISHMENT OF SMALL SCALE IRRIGATION SCHEMES IN KANO (YASANYA AND OTHERS), JIGAWA AND BAUCHI STATES YASANYA AND OTHERS, JIGAWA AND BAUCHI STATES 56,802,784.50 SLARS NIG. LTD 11,433,000.00 6,000,000.00 6,000,000.00 ONGOING  
88 COMPLETION OF GALALA IRRIGATION PROJECT GALALA, NINGI LGA, BAUCHI STATE                              –   NEW 29,400,000.00 17,500,000.00 17,500,000.00 ONGOING  
89 CONSTRUCTION OF KYARAMA IRRIGATION SCHEME JIGAWA STATE KYARAMA, JIGAWA STATE 209,333,797.31 HDF & SONS NIG. LTD 30,828,000.00 28,322,670.78 28,322,670.78 ONGOING  
90 CONSTRUCTION OF KANTI – GADA, KUDA AND KWAITA SMALL IRRIGATION SCHEME JIGAWA STATE KANTI-GADA, KUDA AND KWAITA, KAZAURE LGA, JIGAWA STATE 126,144,411.75 MUSTAPHA YAKASAI CONSTR. CO. LTD 20,130,000.00 20,052,000.00 20,052,000.00 ONGOING  
91 ESTABLISHMENT OF IMPROVED SEED MULTIPLICATION AND PROCESSING CENTRE KANO, JIGAWA AND BAUCHI STATES 239,387,504.41 PRINCESS GLAM KN LTD 12,060,000.00 12,024,000.00 12,024,000.00 ONGOING  
92 ESTABLISHMENT OF CENTRE PIVOT SPRINKLER IRRIGATION SCHEME IN HADEJIA, JIGAWA STATE HADEJIA LGA, JIGAWA STATE 193,942,505.59 ABBYSIA INVESTMENT LTD 24,000,000.00 20,000,000.00 20,000,000.00 ONGOING  
93 ESTABLISHMENT OF CENTRE PIVOT SPRINKLER IRRIGATION SCHEME IN JAMA’ARE, BAUCHI STATE JAMA’ARE LGA, BAUCHI STATE 199,600,851.24 ISA HALILU NIG. LTD 17,760,000.00 15,104,000.00 15,104,000.00 ONGOING  
94 ESTABLISHMENT OF DRIP IRRIGATION SCHEMES IN KANO, JIGAWA AND BAUCHI STATES KANO, JIGAWA AND BAUCHI STATES 109,408,699.53 DILLS GRANTAL NIG. LTD 14,310,000.00 13,724,000.00 13,724,000.00 ONGOING  
95 COMPLETION OF KIRI-KASAMMA, GURI AND BIRNIWA SMALL IRRIGATION SCHEMES KIRI-KASAMMA, GURI AND BIRNIWA LGAs, JIGAWA STATE 46,600,056.00 S.U.B. VENTURES LIMITED 3,405,000.00 0 0 NEW  
96 CONSTRUCTION OF KAFIN ZAKI SMALL IRRIGATION SCHEME KAFIN ZAKI, NINGI LGA, BAUCHI STATE 10,134,862.50 RAMADAN CONSTRUCTION NIG. LTD 10,095,000.00 0 0 ONGOING  
97 CONSTRUCTION OF UDUBO – WABU IRRIGATION SCHEME UDUBO WABU, GAMAWA LGA, BAIUCHI STATE 54,046,424.25 ALTIMA INERGRATED SERVICES LTD 18,000,000.00 7,200,000.00 7,200,000.00 ONGOING  
98 OPERATION AND MAINTENANCE OF HADEJIA VALLEY IRIGATION PROJECT INFRASTRUCTURES HADEJIA LGA, JIGAWA STATE 248,676,225.00 M-SULUM NIG. LTD 41,490,000.00 40,596,000.00 40,596,000.00 ONGOING  
99 OPERATION AND MAINTENANCE OF KANO RIVER IRRIGATION PROJECT INFRASTRUCTURES KURA LGA, KANO STATE 231,471,865.01 PAL OVERSEAS RESOURCES LTD 45,000,000.00 38,000,000.00 38,000,000.00 ONGOING  
100 COMPLETION OF CHALLAWA KARAYE IRRIGATION SCHEME CHALLAWA, KARAYE LGA, KANO STATE 27,731,182.50 AKOON MULTI SERVICES LTD 31,950,000.00 3,000,000.00 3,000,000.00 ONGOING  
101 ESTABLISHMENT OF CENTRE PIVOT SPRINKLER IRRIGATION SCHEME IN TUDUN WADA LGA, KANO STATE TUDUN WADA LGA, KANO STATE 257,957,932.98 POTENZIA SEED LTD 24,360,000.00 24,000,000.00 24,000,000.00 ONGOING  
102 CONSTRUCTION OF SHANGU SMALL EARTH DAM AND IRRIGATION SCHEME IN KANO STATE SHANGU, RANO LGA, KANO STATE 238,525,693.55 S. TABAWA NIGERIA LTD 15,050,558.00 10,000,000.00 10,000,000.00 ONGOING  
103 COMPLETION OF TSANYAWA-WANZAMAI SMALL EARTH DAM TSANYAWA WANZAMAI KANO STATE 15,000,000.00 AU IYA GLOBAL VENTURES LTD 15,000,000.00 2,250,000.00 2,250,000.00 ONGOING  
104 REHABILITATION OF HADEJIA PUMP BASED IRRIGATION SCHEME HADEJIA LGA, JIGAWA STATE 130,234,107.44 YAYARI VENTURES NIG. LTD 17,400,000.00 8,402,374.85 8,402,374.85 ONGOING  
105 OPERATION AND MAINTENANCE OF TIGA DAM TIGA, BEBEJI LGA, KANO STATE 85,266,964.13 CIMULLA NIGERIA LTD 48,748,800.00 44,499,520.00 44,499,520.00 ONGOING  
106 REHABILITATION AND REMODELLING OF WUDIL PILOT IRRIGATION SCHEME FOR COMMERCIAL OPERATIONS, KANO STATE WUDIL LGA, KANO STATE 97,753,386.98 SANROUK ENGR. SERVICES LTD 15,060,000.00 10,000,000.00 10,000,000.00 ONGOING  
107 COMPLETION OF SAWE PILOT IRRIGATION SCHEME SAWE, SHIRA LGA, BAUCHI STATE 246,497,556.15 KAGO NIGERIA LIMITED 130,000,000.00 87,701,236.27 87,701,236.27 ONGOING  
108 COMPLETION OF KATAGUM IRRIGATION PROJECT KATAGUM, ZAKI LGA, BAUCHI STATE 182,698,692.75 RAMADAN CONSTRUCTION NIG. LTD 18,060,000.00 13,586,475.18 13,586,475.18 ONGOING  
109 CONSTRUCTION OF GWANI IRRIGATION SCHEME GWANI, JIGAWA STATE 6,412,875.00 ABDURRAHMAN ABDULHAMID VENTURES LTD 6,405,000.00 6,092,231.25 6,092,231.25 ONGOING  
110 COMPLETION OF SATA SMALL EARTH DAM SATA, BEBEJI LGA, KANO STATE 66,441,863.25 SAT ENGINEERING SERVICES LTD 20,400,000.00 10,000,000.00 10,000,000.00 ONGOING  
111 REHABILITATION AND EXPANSION OF COMMERCIAL ORCHADS IN KADAWA, CHALLAWA, HADEJIA AND ZIGAU IN KANO, JIGAWA AND BAUCHI STATES KADAWA, CHALLAWA, HADEJIA AND ZIGAU IN KANO, JIGAWA AND BAUCHI STATES 98,931,536.48 U.Y.K. NIGERIA LTD 12,390,000.00 0 0 ONGOING  
112 OPERATION AND MAINTENANCE OF HADEJIA BARRAGE HADEJIA LGA, JIGAWA STATE 143,367,000.00  CENTURY TRADE LTD 35,060,000.00 32,500,000.01 32,500,000.01 ONGOING  
113 REHABILITATION OF HADEJIA VALLEY IRRIGATION PROJECT CAMP WATER SUPPLY SCHEME AND OTHER INFRATRUCTURES HADEJIA LGA, JIGAWA STATE 71,440,785.05 HAITEL NIGERIA LTD 4,512,491.00 0 0 ONGOING  
114 CONSTRUCTION OF EARTH DAM AND IRRIGATION SCHEME AT MISAU, BAUCHI STATE – ON-GOING MISAU, BAUCHI STATE 149,805,649.35 KAGO NIGERIA LTD 51,101,490.00 9,555,502.35 9,555,502.35 ONGOING  
115 REHABILITATION OF WARWADE DAM AND IRRIGATION SCHEME, JIGAWA STATE WARWADE, DUTSE LGA, JIGAWA STATE 98,452,895.44 CIVHYDRO ENGINEERING NIG. LTD 21,120,000.00 15,000,000.00 15,000,000.00 ONGOING  
116 COMPLETION OF TAFGA EARTH DAM AND WATER SUPPLY SCHEME TAFGA TUDUN WADA LGA, KANO STATE 0 RHOZETA NIG. LTD 26,400,000.00     ONGOING  
117 OPERATION AND MAINTENANCE OF CHALLAWA GORGE DAM CHALLAWA, KARAYE LGA, KANO STATE 75,835,187.00 A.Y.H INVESTMENT COMPANY LIMITED 33,307,000.00 20,000,000.00 20,000,000.00 ONGOING  
118 CONSTRUCTION OF EARTH DAM AND IRRIGATION SCHEME AT MAIGATARI, JIGAWA STATE – ON-GOING MAIGATARI LGA, JIGAWA STATE 198,376,132.50 M. SULUM NIGERIA LTD 61,600,000.00 62,683,000.00 62,683,000.00 ONGOING  
119 CONSTRUCTION OF BURA EARTH DAM BURA, WARJI LGA, BAUCHI STATE 196,063,826.18 SISOCO CIVIL ENGINEERING CO. LTD 30,204,269.00 0 0 ONGOING  
120 ESTABLISHMENT OF YANOKO LANGEL SMALL IRRIGATION SCHEME YANOKO AND LANGEL, DAWAKIN TOFA LGAs, KANO STATE 6,081,000.00 KYE BUILDERS & INVESTMENT LTD 6,081,000.00 0 0 ONGOING  
121 LARGE DAMS (TIGA AT TUKU, CHALLAWA AT ZAREWA, GALALA AT TUDUN WADA AND HADEJIA BARRAGE AT GANAUCHIME) WATER SHED MANAGEMENT AND CATCHMENT ACCESS ROADS REHABILITATION IN KANO, JIGAWA AND BAUCHI STATES. TIGA AT TUKU, CHALLAWA AT ZAREWA, GALALA AT TUDUN WADA AND HADEJIA BARRAGE AT GANAUCHIME)  IN KANO, JIGAWA AND BAUCHI STATES 224,189,317.80 S.K & SONS ENGINEERING SERVICES LTD 33,999,000.00 32,000,000.00 32,000,000.00 ONGOING  
122 REHABILITATION OF HJRBDA REVENUE GENERATING ASSETS IN KANO, JIGAWA AND BAUCHI STATES  KANO, JIGAWA AND BAUCHI STATES 127,751,669.33 TRIPPLE K INVESTMENT LTD 42,060,000.00 31,824,000.00 31,824,000.00 ONGOING  
123 COMPLETION OF BICHI DAM BICHI LGA, KANO STATE 120,150,000.00 KAGO NIGERIA LIMITED 22,200,000.00 0 0 ONGOING  
124 CONSTRUCTION OF KUNGU AND MALIKAWAR GARU SMALL EARTH DAMS KUNGU AND MALIKAWAR GARU, BICHI LGA, KANO STATE 8,910,000.00 DILLS GRANTAL NIG. LTD 8,910,000.00 3,000,000.00 3,000,000.00 ONGOING  
125 CONSTRUCTION OF KOREYEL EARTH DAM, KANO STATE KOREYEL, KANO STATE 199,145,886.98 ALPHA – ZETA GLOBAL TECH. SERVICES LTD 23,930,745.00 23,572,298.00 23,572,298.00 ONGOING  
126 KATAGUM FLOOD CONTROL AND LAND RECLAMATION PROJECT, BAUCHI STATE KATAGUM, ZAKI LGA, BAUCHI STATE 231,250,356.83 A. U IYA GLOBAL VENTURES LTD 25,380,000.00 25,380,000.00 25,380,000.00 ONGOING  
127 KAIDAJI-ALKAMAWA FLOOD PROTECTION AND LAND RECLAMATION PROJECT, KANO STATE KAIDAJI AND ALKAMAWA, KANO STATE 213,985,202.09 GUJI GLOBAL LINKS LTD 80,660,000.00 0 0 ONGOING  
128 ANNUAL BUDGET IMPLEMENTATION MONITORING AND EVALUATION HOTORO, KANO STATE 0 (Ag. ED PLANNING) 14,700,000.00 3,000,000.00 3,000,000.00 ONGOING Routine budget implementation, monitoring and evaluation
      0 HEAD OF PROCUREMENT   2,577,999.64 2,577,999.64   Procurement processes
129 CONSTRUCTION OF BEBEJI EARTH DAM KANO STATE BEBEJI LGA, KANO STATE 89,144,123.13 KAGO NIG. LTD 102,000,000.00 30,000,000.00 30,000,000.00   ONGOING
130 CONSTRUCTION OF GULKA/DARAZO EARTH DAM, BAUCHI STATE GULKA, DARAZO LGA, BAUCHI STATE 130,086,950.00 HAITRIX INNOVATION SERVICES LTD 44,160,000.00       ONGOING
131 DESILTING OF BIRNIN KUDU DAM, BIRNIN KUDU LGA, JIGAWA STATE BIRNIN KUDU DAM, BIRNIN KUDU LGA, JIGAWA STATE 41,951,325.00 BAMZY LTD 39,660,000.00 1,800,000.00 1,800,000.00   ONGOING
132 OPERATION AND MAINTENANCE OF GALALA EARTH DAM GALALA, NINGI LGA, BAUCHI STATE 195,195,309.75 SAT ENGINEERING SERVICES LTD 30,360,000.00 28,216,000.00 28,216,000.00   ONGOING
133 HADEJIA JAMA’ARE-KOMADUGU-YOBE RIVER SYSTEM IMPROVEMENT PROJECT KOMADUGU, YOBE STATE 208,242,294.75 HAWLAD ENGINEERING LTD 33,510,000.00 32,000,000.00 32,000,000.00   ONGOING
134 REHABILITATION OF 34 NOS SMALL EARTH DAMS AT KANO, JIGAWA AND BAUCHI STATES KANO, JIGAWA AND BAUCHI STATES 37,925,779.50 GLOVESLY PRO-PROJECT LTD 22,560,000.00 10,000,000.00 10,000,000.00   ONGOING
135 AJINGI/RINJIN FULANI KURA STORM WATER AND FLOOD CONTROL PROJECT AJINGI AND RINJIN FULANI, KURA LGAs, KANO STATE 246,920,299.24 KYE BUILDERS & INVESTMENT LTD 57,255,000.00 57,255,000.00 57,255,000.00   ONGOING
136 CULVERTS, DRAINAGES AND ROADS CONSTRUCTION AND FLOOD CONTROL IN HADEJIA FLOOD PLAINS HADEJIA LGA, JIGAWA STATE 0 NEW 2,725,500.00 0 0   ONGOING
137 LARGE DAM WATERSHED MANAGEMENT AND CATCHMENT ACCESS ROADS REHABILITATION IN KANO, JIGAWA AND BAUCHI STATES KANO, JIGAWA AND BAUCHI STATES 236,371,200.79 SAT ENGINEERING SERVICES LTD 54,129,000.00 30,000,000.00 30,000,000.00   ONGOING
138 PROCUREMENT OF LAND PREPARATION AND POST HARVEST EQUIPMENT TO SUPPORT AGRICULTURAL INTENSIFICATION WITHIN HJRBDA IRRIGATION SCHEMES KANO, JIGAWA AND BAUCHI STATES 96,190,500.00 SAINT ENGINEERING SERVICES LTD 26,160,000.00 19,420,830.00 19,420,830.00   ONGOING
139 CONSTRUCTION OF LIGADA MAKERA SMALL EARTH DAM LIGADA AND MAKERA, BAUCHI STATE 23,108,620.50 GIDAN ADEDE GEN. ENT. LTD 23,930,745.00 4,621,724.10 4,621,724.10   ONGOING
140 MAIGATARI FLOOD CONTROL AND LAND RECLAMATION PROJECT, JIGAWA STATE MAIGATARI LGA, JIGAWA STATE 234,186,435.00 M-SULUM NIG. LTD 27,607,500.00 26,043,000.00 26,043,000.00   ONGOING
141 UPGRADING OF HYDROMETEOROLOGICAL STATIONS ALONG HADEJIA AND JAMA’ARE RIVER SYSTEM HADEJIA AND JAMA’ARE LGAs, JIGAWA AND BAUCHI STATES 9,965,700.00 MASY NIGERIA LIMITED 12,660,000.00 4,000,000.00 4,000,000.00   ONGOING
142 PROVISION OF PLANTS AND MACHINERY FOR INFRASTRUCTURE MAINTENANCE KANO, JIGAWA AND BAUCHI STATES 177,845,842.55 QUADRIPLE CONSTR. CO. LTD 60,060,000.00 51,000,000.00 51,000,000.00   ONGOING
143 UNIVERSITY OF DUTSE FLOOD AND EROSION CONTROL PROJECT DUTSE, JIGAWA STATE 208,618,991.99 A. Y. H INVESTMENTS COMPANY LTD 51,060,000.00 45,424,000.00 45,424,000.00   ONGOING
144 LAND HOLDING REVALIDATION SURVEY IN KANO RIVER AND HADEJIA VALLEY IRRIGATION PROJECTS KANO, JIGAWA AND BAUCHI STATES 21,158,500.00 INTERGRATED LAND SURVEY SERVICES 13,260,000.00 3,389,625.00 3,389,625.00   ONGOING
145 ESTABLISHMENT AND EQUIPPING OF WATER RESOURCES INFORMATION AND BRIEFING CENTRE AT HJRBDA HEADQUARTERS HOTORO, KANO STATE 246,612,660.00 AMHO NIG. LTD 26,160,000.00 22,464,000.00 22,464,000.00   ONGOING
146 SETTLEMENT OF OUTSTANDING LIABILITIES ON AGRICULTURAL FACILITIES KANO, JIGAWA AND BAUCHI STATES 722,320,856.77 TURABU CONSTR. LTD 72,000,000.00 71,890,535.27 71,890,535.27   ONGOING
147 HADEJIA RIVER CHANNEL IMPROVEMENT PROJECT ON FLOOD CONTROL HADEJIA, JIGAWA STATE 141,408,750.00 A4 VENTURES LTD 1,500,000.00                           –                             –     ONGOING
148 CHANNELISATION OF RIVER FOR SMALL TOWN IRRIGATION HADEJIA, JIGAWA STATE 31,110,345.00 YAYARI VENTURES NIG. LTD 1,500,000.00                           –                             –     ONGOING
149 SMALL IRRIGATION SCHEME AT KANKIYA/KUSADA/INGAWA KANKIYA, KUSADA AND INGAWA LGAs, KATSINA STATE 78,951,862.50 NDA TECHNICAL SERVICES LTD 1,500,000.00                           –                             –     NEW
150 SMALL IRRIGATION SCHEME AT KYARANA – KIRU LGA KYARANA, KIRU LGA, KANO STATE 172,330,095.00 POTENZIA SEED LTD 1,500,000.00                           –                             –     ONGOING
151 MARATAYI/KOFAR GABAS, ZANGON TAGWAI, KAWAJI AND SAUNA FLOOD AND EROSION CONTROL, KANO STATE MARATAYI/KOFAR GABAS, ZANGON TAGWAI, KAWAJI AND SAUNA, NASARAWA LGA, KANO STATE 0   1,500,000.00       NEW
152 GWANDARI FANISAU SATA DRIP IRRIGATION AND FLOOD CONTROL PROJECT, KANO STATE GWANDARI FANISAU, SATA, BEBEJI LGA, KANO STATE 252,916,334.85 ABDULRAHMAN ABDULHAMID VENTURES LTD 51,500,000.00 54,658,002.42 54,658,002.42 ONGOING  
153 GRADUATE EMPLOYMENT IN IRRIGATED AGRICULTURE SCHEME KANO, JIGAWA AND BAUCHI STATES 58,000,000.00 HAITEL NIG. LTD 24,600,000.00 7,450,383.00 7,300,000.00 ONGOING  

2019 ZONAL INTERVENTION PROJECTS

S/N  PROJECT TITLE  PROJECT LOCATION/STATE CONTRACT SUM (N) CONTRACTOR  APPROPRIATION AMOUNT RELEASED UTILISATION STATUS (NEW/ONGOING) REMARKS
1 CONSTRUCTION OF POLICE OUTPOST WITHIN JIGAWA SOUTH WEST SENATORIAL DISTRICT, JIGAWA STATE DAWAKIN KUDU LGA, KANO STATE 19,454,179.50 HASH GLOBAL & ENGINEERING SERVICES LTD 30,000,000 12,000,000.00 6,883,603.75 ONGOING PROJECT  
2 SETTLEMENT OF LIABILITY AND COMPLETION OF FURNITURE/ICT EQUIPMENT FOR HADEJIA RESOURCES CENTRE, JIGAWA NORTH EAST SENATORIAL ZONE, JIGAWA STATE KANO, JIGAWA AND BAUCHI STATES 104,774,714.25 YAHAYA BUHARI AND SONS LTD 47,500,000 19,000,000.00 14,250,000.00   SETTLEMENT OF LIABILITY
3 SETTLEMENT OF LIABILITY AND COMPLETION OF WORSHIP CENTRES AND COMPENSATION FOR ACCESS ROAD AT JIGAWA NORTH EAST SENATORIAL ZONE, JIGAWA STATE KANO, JIGAWA AND BAUCHI STATES 112,256,055.95 NA BAKWAI ENTERPRISES LTD 47,500,000 19,000,000.00 14,250,000.00   SETTLEMENT OF LIABILITY
4 SETTLEMENT OF LIABILITY AND COMPLETION OF PURCHASE OF AMBULANCE AND HEAVY DUTY EQUIPMENTS FOR COMMUNITY ASSISTANCE PROJECT AT JIGAWA NORTH EAST SENATORIAL ZONE, JIGAWA STATE KAUYEN MUJE, KANGIRE, BIRNIN KUDU, KURA AND OTHER VILLAGES IN JIGAWA STATE 48,510,000.00 M.G.K GLOBAL SERVICES LTD 47,500,000 19,000,000.00 13,510,000.00   SETTLEMENT OF LIABILITY
5 SETTLEMENT OF LIABILITY IN RESPECT OF BAYI ISLAMIYYA, CONSTRUCTION OF LABORATORY AT HADEJIA SCHOOL OF NURSING, REHABILITATION OF POLICE BARRACKS AT HADEJIA POLICE COMMAND, CONTRUCTION OF CLASSROOM BLOCK AND FURNITURE AT BINYAMINU USMAN POLYTECHNIC AND CONSTRUCTION OF CLASSROOM BLOCK AT HADEJIA ICT CENTRE, JIGAWA NORTH EAST SENATORIAL ZONE, JIGAWA STATE HADEJIA, JIGAWA STATE 24,957,686.25 A.U IYA GLOBAL VENTURES LTD 47,500,000 19,000,000.00 10,000,000.00   SETTLEMENT OF LIABILITY
16,647,330.00 S.U.B GENERAL VENTURES LTD 2,167,916.62   SETTLEMENT OF LIABILITY
36,031,248.94 MUHALLI TURNKEY PROJECTS LTD 4,250,000.00   SETTLEMENT OF LIABILITY
6 PROVISION OF WATER HAND PUMPS/SOLAR POWERED BOREHOLES WITH OVERHEAD TANKS IN VARIOUS COMMUNITIES OF TUDUN WADA/DOGUWA FEDERAL CONSTITUENCY TUDUN WADA AND DOGUWA FEDERAL CONSTITUENCY, KANO STATE 145,775,307.30 SAT ENGINERRING SERVICES LTD 100,000,000 38,702,000.00 30,000,000.00 ONGOING PROJECT  
7 DRILLING OF 4NOS. OF SOLAR BOREHOLES TANK IN AUYO/HADEJIA/KAFINHAUSA FEDERAL CONSTITUENCY, JIGAWA STATE AUYO/HADEJIA/KAFINHAUSA FEDERAL CONSTITUENCY, JIGAWA STATE 28,317,216.38 K & K INTEGRATED ENGR. PROJECT & INVEST. LTD 32,000,000 12,800,000.00 4,247,582.46    
8 DRILLING OF HAND PUMPS BOREHOLE IN BABURA/GARKI FEDERAL CONSTITUENCY, JIGAWA STATE BABURA AND GARKI FEDERAL CONSTITUENCY, JIGAWA STATE 17,057,077.80 USAINI ALASAN BARO GEN. ENTERPRISES NIG. LTD 18,428,571 7,371,428.40 7,371,428.40    
9 SUPPLY OF 2″ WATER PUMPS AT KAZAURE/RONI/GWIWA/YANKWASHI FEDERAL CONSTITUENCY, JIGAWA STATE KAZAURE/RONI/GWIWA/YANKWASHI FEDERAL CONSTITUENCY, JIGAWA STATE 17,057,077.80 RAMADAN CONSTRUCTION NIG. LTD 25,000,000 12,098,000.00 7,098,000.00 ONGOING PROJECT  
MOUKFAM NIGERIA LTD 5,000,000.00
10 COMPLETION OF PAYMENT FOR THE PROVISION OF BOREHOLES IN TSANYAWA (2014 DUMBULUM INVESTMENT CO LTD) TSANYAWA LGA, KANO STATE 17,057,077.80 DUMBULUM INVESTMENT 2,000,000 0 0    
11 CONSTRUCTION OF ROAD FROM KIYAWA – ROMO IN SHANONO/BAGWAI FEDERAL CONSTITUENCY, KANO STATE SHANONO AND BAGWAI FEDERAL CONSTITUENCY, KANO STATE 17,057,077.80 MAI MAKANI NIG. LTD 52,000,000 20,800,000.00 15,300,000.00    
 12 STUDY, DESIGN AND BID PREPARATION FOR THE , CONSTRUCTION OF ROAD FROM KIYAWA – ROMO IN SHANONO/BAGWAI FEDERAL CONSTITUENCY, KANO STATE KIYAWA, ROMO IN SHANONO AND BAGWAI FEDERAL CONSTITUENCY, KANO STATE 17,057,077.80 SIIS ENGINEERING CONSULTANTS LTD 5,500,000.00    


5.0       Details of Revenue Generation in 2019

  2019 INTERNALLY GENERATED REVENUE REVENUE SOURCE 2019 (N) Land preparation (THS) 7,660,797.50 Land lease 786,751.38 Rent 761,000.00 Contract registration 2,905,000.00 Tender fee 3,730,000.00 Plant hire 5,714,000.00 Water charges 9,734,130.50 Others (Stores, auction, etc) 794,484.00 TOTAL 32,086,163.38  

6.0 Collaborations with some Institutes

The Authority collaborated with constituted institutions which resulted in several skill acquisition trainings for livelihood enhancement. Summary of collaborations over the years under review:

TRIMMING

  • Collaboration between FGN and World Bank in custody of FMWR on total package for rehabilitation of dams and irrigation infrastructures, within the HJRBDA projects are among the beneficiaries.

.

7.0       General Challenges/constraints

Major Challenges

  • Deterioration of Authority’s major dams and irrigation Schemes with cost of rehabilitation far beyond annual budgetary provisions
  • Loss of irrigation command areas due to dilapidation of water delivery structures
  • Invasion of Hadejia Barrage and RuwanKanya reservoir by typha grass, prime rose and other devastating aquatic weeds
  • Lack of irrigation and extension support staff for the effective operation and maintenance of the irrigation Schemes and advisory services to farmers respectively.
  • Inadequate skilled technical manpower to manage Authority’s dams and irrigation projects due to continuous staff exit, retirement from service and deaths.
  • Lack of regular staff training for skill improvement due to insufficient budgetary allocations under the recurrent budget.
  • Relatively low revenue generation due to ageing revenue generating infrastructure/assets, inadequate staff and poor revenue collection logistics.
  • Inadequate budgetary provisions and late budgetary releases
        EXECUTIVE SUMMARY
2019 CAPITAL BUDGET PERFORMANCE   ITEM 2019 CORE PROJECTS 2019 ZONAL INTERVENTION PROJECTS 2019 APPROPRIATION 5,732,519,205.00 449,428,571.00 TOTAL RELEASES 2,293,007,682.00 179,771,428.40 % OF RELEASES TO APPROPRIATION 40 40 TOTAL UTILIZATION TO RELEASES 2,292,857,299.00 139,828,531.23 % OF UTILIZATION TO RELEASES 99.99 77.78 OUTSTANDING BALANCE ON RELEASES 150,383.00 39,942,897.17      

9.0       Way Forward/Future Direction of the Authority

  • Immediate rehabilitation of major dams and irrigation infrastructure of the Authority to ensure their stability and safety as well as efficient service delivery to the farmers, increased food production and enhanced national food security.  This is expected to be substantially addressed under the TRIMMING Projects.
  • Employment of skilled manpower for effective operations and maintenance of infrastructure at all levels. 
  • Regular training and retraining of staff and full utilization of their potentials
  • Organization and capacity building of farmers to prepare them for effective participation in the management of their irrigation schemes
  • Reinvigoration of the revenue generation machinery and diversification of revenue sources.  The Authority has recently developed a blue print for improved revenue generation which among others includes the organization and strengthening of Water Users Associations (farmers) for their participation in system operation and maintenance as well as collection of water fees.  Other aspects of the blue print include diversification of revenue sources, review of rates/tariffs, and improvement of revenue collection and banking procedures, improved logistics support to revenue staff and close supervision and monitoring of revenue generation entities/units.
  • Promotion of Public Private Partnership (PPP) in the operation of Wudil Pilot Irrigation Scheme, Yamidi Pilot Farm, Sawe Pilot Irrigation Scheme, Galala Irrigation Scheme and Challawa Spring Water Venture.


2019  PERSONNEL MATTERS

SN TOTAL STAFF STRENGTH IN 2019 TOTAL STAFF STRENGTH OF AUTHORITY IN 2019 NO. STAFF RECRUITED IN 2019 NO. OF STAFF DISCIPLINE IN 2019 SPECIFIC ACHIEVEMENTS OF APPOINTMENT, PROMOTION AND DSICIPLNE DIVISION IN 2019 NO. OF DISCIPLINARY COMMITTEE MEETING HELD IN 2019 CHALLENGES REMARKS
Snr Jnr Snr Jnr Snr Jnr Snr Jnr
1 278  85  272  85  Nil  Nil  Nil   Nil  66 Nos. of Staff both senior and junior were promoted to various cadres and salary Grade Levels Nil   Non availability of funds to settle 2018/2019 promotion arrears Despite the numerical challenges, the Management of the Authority still aspire to achieve more.

2019 PERSONNEL MATTERS (Contd)

SN NO. OF STAFF ADVANCED IN 2019 NO. OF CONVERSION MADE IN 2019 NO. OF DEATH RECORDED IN 2019 NO. OF STAFF THAT ABSCONDED IN 2019 NO. STAFF THAT WERE UPGRADED IN 2019 NO. OF STAFF WITHDRAWN FROM SERVICE IN 2019 NO. OF STAFF RETIRED VOLUNTARILY IN 2019 NO. OF STAFF THAT RESIGNED IN 2019 NO. OF STAFF THAT WERE DISMISSED IN 2019
Snr Jnr Snr Jnr Snr Jnr Snr Jnr Snr Jnr Snr Jnr Snr Jnr Snr Jnr Snr Jnr
1 1 Nil  3 Nil  Nil Nil  Nil Nil  Nil Nil  Nil Nil  Nil Nil  Nil Nil  Nil  Nil

BOARD / TRAINING / STAFF WELFAREMATTERS

SN NO. OF BOARD MEETING HELD IN 2019 SPECIFIC ACHIEVEMENT OF BOARD IN 2019 NO. OF STAFF THAT BENEFITED FROM RAINING IN 2019 SPECIFIC ACHIEVEMENTS ON TRAINING DIVISION IN 2019 SPECIFIC ACHIEVEMENTS ON STAFF WELFARE IN 2019        CHALLENGES
Senior Junior Local International
1 20 Nil  14 6 It immensely contributes towards staff performances and productivities   Financial Constraints to sponsor staff for training such as full-time, seminars and workshops particularly International Training

2019 PENSION MATTERS

SN TOTAL NO. OF RETIREES UNDER UNIFIED PENSION SCHEME IN THE AUTHORITY’S PAYROLL IN 2019 TOTAL NO. OF RETIREES UNDER CONTRIBUTORY PENSION SCHEME IN 2019 NO. OF BOARD OF TRUSTEES (BOT) MEETINGS HELD IN 2019 AMOUNT RELEASED FOR PAYMENT IN OF PENSIONERS UNDER UNIFIED PENSION SCHEME IN 2019 ACTUAL AMOUNT PAID TO THE PENSIONERS UNDER UNIFIED PENSION SCHEME IN 2019 SPECIFIC ACNIEVEMENTS ON PENSION MATTERS IN 2019 CHALLENGES REMARKS
1 492 Nil Contact PTAD Contact PTAD Payment of monthly pension is running smoothly and also payment of 33% pension arrears have been settled by Pension Transitional Arrangement Directorate (PTAD) Omission of 3 pensioners from  payment of monthly pension, gratuity and 33% pension arrears by PTAD  There is a cordial relationship between Hadejia Jama’are River Basin Development Authority and PTAD