Month: July 2020

CHALLAWA KARAYE IRRIGATION SCHEME

The Challawa Karaye Irrigation Scheme (CKIS) is located at Turawa Village in Karaye Local Government Area of Kano State. The Scheme is planned to cover about 200 hectares of irrigable land to provide the community access to irrigated land. The Karaye community is host to the famous Challawa Gorge Dam but did not have the […]

Wudil Pilot Irrigation Scheme

The Wudil Pilot Irrigation Scheme is a 200-hectare scheme located at Kanyar Babale Village near Wudil town 30 Km along Kano-Maiduguri road in Kano State.  The Scheme was established in 1979/81 to pilot the development of the proposed Kano River Irrigation Project Phase II, which has a development potential of 40,000 hectares of irrigable land. […]

KATAGUM IRRIGATION PROJECT

Katagum Irrigation Project is part of the 125,000 hectares identified as Jama’are Valley Project area in early 1970’s by Messrs. SCHULTZ International Consultants. The project has an estimated gross potential area of 8,700 hectares, which is presently under construction as a Pilot Project located near Katagum town on the Northwestern bank of the River Katagum.  […]

GALALA DAM AND IRRIGATION PROJECT

The Galala Dam is a medium size earth fill dam located on the boundary between Jigawa and Bauchi States.  It is constructed across the Galala River, a tributary of Jama’are/Bunga River.  The site is accessible through two seasonal roads of 18km from Kila Town along Kano – Maiduguri Road and 25km from Nasaru on Bauchi […]

HADEJIA VALLEY IRRIGATION PROJECT, PHASE I

The Hadejia Valley Project, Phase I is located within Auyo, Kaugama, Miga, Kafin Hausa and Hadejia Local Government Areas of Jigawa State between the Hadejia and Kafin Hausa rivers. The project is designed in such a way that water released from the upstream Challawa and Tiga dams into the river system could be used for […]

KANO RIVER IRRIGATION PROJECT PHASE I

Kano River Irrigation Project, Phase I (KRIP I), is one of the largest and successful irrigation projects in Nigeria. The Project is located in Bunkure, Kura and Garun Malam Local Government Area of Kano State with Project Headquarters at Kura. It lies about 35km south-west of Kano city, on both sides of Kano – Zaria […]

CHALLAWA GORGE DAM

The Challawa Gorge Dam is a large earth fill dam constructed on Challawa River at Karaye, some 90 km South-west of Kano City. The dam is designed to create a multipurpose reservoir to in conjunction with the Tiga dam serve the water needs of downstream areas in Kano, Jigawa, Yobe and Borno States. Principal uses […]

RUWAN KANYA RESERVOIR

The Ruwan Kanya Reservoir is a 3.66 km long earth filled dam with storage capacity of 58 million cubic meters of water annexed to the Tiga Dam to serve as a balancing reservoir located at about 5.1km downstream of the Tiga Dam. The main features of the structure are: a. Embankment length – 3,600m b. […]

TIGA DAM

The Tiga Dam is a zoned filled earth dam located on River Kano, 70 km south of Kano City.  It is one of the largest dams in the country and was designed and built between 1970 and 1974.  This Dam is the cornerstone of water resources development in the Kano River Valley in Kano State […]

Phone: 064668237 Email: info@hjrbda.kn.gov.ng